Remove Design Remove Environment Remove Gas Remove Mexico
article thumbnail

US offshore oil and gas leasing plan for 2017-2022 focuses on Gulf of Mexico, excludes Arctic

Green Car Congress

The Proposed Final Program offers 11 potential lease sales in four planning areas—10 sales in the portions of three Gulf of Mexico Program Areas that are not under moratorium and one sale off the coast of Alaska in the Cook Inlet Program Area. The vast majority of US offshore oil production occurs in the Gulf of Mexico.

Mexico 150
article thumbnail

UT Austin to lead $58M study of methane hydrate in Gulf of Mexico; $41M from DOE

Green Car Congress

A research team led by The University of Texas at Austin has been awarded approximately $58 million to analyze methane hydrate deposits under the Gulf of Mexico. Methane hydrate—natural gas trapped in an ice-like cage of water molecules—occurs in both terrestrial and marine environments. Click to enlarge.

Mexico 294
article thumbnail

National Academies’ Gulf Research Program awards $10.8M to address systemic risk in offshore oil and gas operations

Green Car Congress

million to six new projects to develop new technologies, processes, or procedures that could result in improved understanding and management of systemic risk in offshore oil and gas operations. Well leakage through cement is a problem that increases maintenance costs and poses threats to surrounding communities and the environment.

Oil 150
article thumbnail

BP approves revamped $9B Mad Dog Phase 2 project in the deepwater Gulf of Mexico; down from original $20B cost

Green Car Congress

BP has sanctioned the $9-billion Mad Dog Phase 2 project in the United States, despite the current low oil price environment. Since then, BP has worked with co-owners and contractors to simplify and standardize the platform’s design, reducing the overall project cost by about 60%. In 2013, BP (operator, with 60.5%

Mexico 150
article thumbnail

BP selects Technip for the Thunder Horse South Expansion project in the ultra-deep Gulf of Mexico

Green Car Congress

awarded Technip a lump sum project for the design, engineering, fabrication, installation and pre-commissioning of the new production pipeline systems on the south side of the Thunder Horse production drilling quarters unit. BP Exploration & Production Inc. The project scope covers: Project management and engineering.

Mexico 150
article thumbnail

Argonne researchers developing multifunctional farm landscapes balancing economy, bioenergy and environment

Green Car Congress

In collaboration with the farming community of the Indian Creek Watershed in central Illinois, researchers from Argonne National Laboratory (ANL) are finding ways to meet three agrarian land management objectives simultaneously: maximizing a farmer’s production; growing feedstock for bioenergy; and protecting the environment.

article thumbnail

Douglas-Westwood: oil & gas industry need to push High-Pressure - High Temperature envelope

Green Car Congress

Ultra-HP/HT wells are currently being drilled in the Gulf of Mexico, on the shelf and in deep water. There are many technological challenges that must be overcome for downhole service and completion tools to operate successfully in the Ultra-HPHT environment. Click to enlarge.