article thumbnail

Washington, Oregon, CA, & Nevada EV Policies in the News, Cycling Surge Here to Stay, EA

EV Obssesion

Electrify America: Extensive installations and new collaborations signal company’s leadership in deploying technology to help stabilize pricing, develop behind-the-meter grid services, and support a fast-growing EV industry. Reaches 30 Megawatts in Installed Battery Energy Storage.

Oregon 79
article thumbnail

Ocean Power Technologies Signs Stakeholder Agreement for Oregon Wave Energy Project

Green Car Congress

Ocean Power Technologies, Inc. has signed a Settlement Agreement (SA) with 11 federal and state agencies and three non-governmental stakeholders for its utility-scale wave power project at Reedsport, Oregon. Manufacturing of the first 150 kW PB150 PowerBuoy is already underway at Oregon Iron Works under its contract with OPT.

Oregon 207
article thumbnail

DOE awards up to $40M for open-water, grid-connected wave energy testing facility

Green Car Congress

The US Department of Energy (DOE) announced the award of up to $40 million, subject to appropriations, to design, permit, and construct an open-water, grid-connected national wave energy testing facility. For context, approximately 90,000 homes can be powered by 1 TWh per year.

article thumbnail

DOE awarding nearly $8M for national laboratory H2@Scale projects

Green Car Congress

The selected projects, or cooperative research and development agreements (CRADAs), will leverage the Advanced Research on Integrated Energy Systems (ARIES) platform to enable the integration of hydrogen technologies in future energy systems, including energy storage and a specific focus on safety and risk mitigation. Award amount: $525,000).

Seattle 320
article thumbnail

DOE announces 15 Phase 1 semifinalists of Geothermal Lithium Extraction Prize

Green Car Congress

The US Department of Energy (DOE) announced 15 Phase 1 semifinalists of the American-Made Geothermal Lithium Extraction Prize, a $4-million competition designed to advance technologies and techniques to support direct lithium extraction from geothermal brines. Massachusetts Institute of Technology – Lithium from Home.

Wyoming 199
article thumbnail

With only days before initial testing, the Formula E grid is finalized

Teslarati

Formula E has finalized its grid of participating teams, including three new participating automakers. Along with these new teams, Formula E is introducing a revamped racing system, new locations, and new technology. The post With only days before initial testing, the Formula E grid is finalized appeared first on TESLARATI.

Grid 52
article thumbnail

Hillsboro, Oregon to Install 16 Coulomb Charging Stations

Green Car Congress

The City of Hillsboro, Oregon plans to deploy 16 Coulomb Technologies ChargePoint Networked Charging Stations for plug-in and electric vehicles. Smart Grid integration for utility load management with future V2G capabilities. Hillsboro is located 15 miles outside of Portland and is the home to more than 90,000 residents.

Oregon 150