article thumbnail

Schlumberger New Energy Venture to launch a lithium extraction pilot plant in Nevada

Green Car Congress

The deployment of the pilot plant will be in Clayton Valley, Nevada, USA. NeoLith Energy’s pilot plant is a step towards a full-scale, commercial lithium production facility. Nevada lithium resources present an excellent opportunity to demonstrate a leap in production efficiency with a more sustainable approach.

Nevada 321
article thumbnail

Albemarle expands Nevada site to increase domestic production of lithium

Green Car Congress

and begin a program to evaluate clays and other available Nevada resources for commercial production of lithium. Beginning in 2021, the company plans to invest $30 million to $50 million to double the current production at the Nevada site by 2025, making full use of its brine water rights.

Nevada 186
article thumbnail

Greenlane Announces 280-Mile Commercial EV Charging Corridor From Los Angeles To Las Vegas

CleanTechnica EVs

Greenlane’s initial corridor sites will be located on Interstate 15 in Colton, Barstow and Baker, California, with additional sites to connect the corridor to Southern Nevada and San Pedro, California. The Colton flagship site will include 60 charging stations for heavy-, medium- and light-duty zero-emissions vehicles (ZEVs). As the demand.

article thumbnail

Tesla Semi spotted charging at newly installed Giga Nevada Megacharger

Teslarati

A Tesla Semi was spotted charging at the company’s newly-installed Megachargers at the Giga Nevada production facility near Sparks, Nevada. Awesome sighting today of a charging Tesla Semi at Tesla Giga Nevada! The post Tesla Semi spotted charging at newly installed Giga Nevada Megacharger appeared first on TESLARATI.

Nevada 145
article thumbnail

Tesla Giga Nevada exceeds 6.5K Powerwall per week, on target to make 442 Megapacks in Q3

Teslarati

A recent meeting with Tesla employees has revealed that Gigafactory Nevada is hitting its stride in the production of the company’s battery storage products like the Powerwall and Megapack. Gigafactory Nevada underwent leadership changes this year, with former Vice President of Gigafactory Operations Chris Lister leaving this summer.

Nevada 145
article thumbnail

Lithium-ion battery recycler ABTC expands operations and capacity with newly purchased facility

Green Car Congress

Most recently in November 2022, ABTC was selected for a competitive US DOE grant for a $20-million project to develop and commercialize a set of next-generation battery recycling technologies to even further enhance the recovery of recycled products and reduce the cost of operations.

article thumbnail

SpaceX completes 28th commercial resupply mission to ISS

Teslarati

This was the 8th mission under Phase 2 of the commercial resupply contract with NASA. A significant note of the Phase 2 contract awarded by NASA, it also included Northrop Grumman Cygnus and Sierra Nevada’s Dream Chaser spaceplane. The post SpaceX completes 28th commercial resupply mission to ISS appeared first on TESLARATI.