Remove Building Remove Commercial Remove Connect Remove Installation
article thumbnail

Volta/Imogen collaboration awarded $12M in ARPA-E funding to commercialize next-generation fast charging technology

Green Car Congress

The project seeks to develop and commercialize the next generation of domestically manufactured DC Fast Charging (DCFC) technology in support of the federal government’s clean energy and climate priorities. SCALEUP selectees demonstrate a viable path to commercial deployment and the ability to attract private sector investments.

article thumbnail

NTSB picks mandatory collision avoidance and connected vehicle technologies as one of most wanted transportation safety improvements

Green Car Congress

The National Transportation Safety Board has released its 2021 – 2022 Most Wanted List of Transportation Safety Improvements; one of the 10 items in the list was “Require Collision Avoidance and Connected Vehicle Technologies on All Vehicles”. Install Crash Resistant Recorders and Establish Flight Data Monitoring Programs.

Connect 305
article thumbnail

Shell to start building Europe’s largest renewable hydrogen plant: Holland Hydrogen I

Green Car Congress

subsidiaries of Shell plc, have taken the final investment decision to build Holland Hydrogen I, which will be Europe’s largest renewable hydrogen plant once operational in 2025. The HyTransPort pipeline begins on the Maasvlakte 2, where the renewable hydrogen plant will be situated and connected to the pipeline. Shell Nederland B.V.

Hydrogen 273
article thumbnail

Vantis and Thales partner to build US’ first statewide drone infrastructure network; BVLOS flights

Green Car Congress

Vantis , North Dakota’s Statewide Unmanned Aircraft Systems Network, will partner with Thales as the long-term systems integrator to build out the UAS (drone) infrastructure across the state. Vantis infrastructure has been installed at key sites in western North Dakota, where testing is currently underway.

article thumbnail

What to note about EV charger installation?

Setec Powerr

In these situations, you’ll want to install an EV charger for your home, but you may be overwhelmed by the process. After all, like any other electrical installation, EV charger installation can be complicated. However, the general level 3 chargers are mainly for commercial use and are very costly.

article thumbnail

Siemens’ Russelectric adds EV charging to Massachusetts renewable microgrid

Green Car Congress

Russelectric, a manufacturer of distributed energy and microgrid control systems for mission-critical commercial facilities that was acquired by Siemens in 2018, has added electrical vehicle charging capabilities at its Hingham, Massachusetts, facility. These Level 2 charging stations have a capacity to charge electric vehicles at up to 7.2

article thumbnail

£20M joint government and private funding to deliver 1,000+ EV chargepoints across England

Green Car Congress

Through the Local EV Infrastructure (LEVI) pilot scheme, local authorities and industry are working together to create new, commercial EV charging infrastructure for residents, from faster on-street chargepoints to larger gasoline station-style charging hubs.