Remove Building Remove Connected Remove Installation Remove Miles
article thumbnail

Plug to build large-scale green hydrogen generation plant at port of Antwerp-Bruges

Green Car Congress

will build a 35-tons-per-day green hydrogen generation plant at Port of Antwerp-Bruges in the heart of Europe. Plug signed a 30-year concession agreement to build the plant at the Belgian port, the second-largest in Europe. Sixty percent of Europe’s purchasing power is located within 300 miles. Plug Power Inc.

Hydrogen 259
article thumbnail

SpaceX installs rocket-catching arms on Starship’s Florida launch tower

Teslarati

SpaceX has installed a pair of rocket-catching arms on a tower meant to support the first East Coast launches of its next-generation Starship rocket. The company has been building the second of several planned Starship launch sites for more than three years. The tower’s ‘chopsticks’ are far more complex.

Florida 104
article thumbnail

Lucid Motors says Lucid Air to be the fastest charging EV yet; 900V+ architecture, up to 20 miles/minute charging

Green Car Congress

Lucid Motors announced the Lucid Air will be the fastest charging electric vehicle yet offered with the capability to charge at rates of up to 20 miles per minute. For owners charging their Lucid Air in real-world conditions on the road, that can translate into 300 miles of range in just 20 minutes of charging.

Charging 170
article thumbnail

Siemens and Nexii unveil sustainable and cost-effective EV charging prototype for faster deployment

Green Car Congress

The new VersiCharge XL concept was created to electrify new or existing parking lots and building structures quickly and efficiently by using a modular, scalable design made in partnership with Nexii Building Solutions (Nexii) using their proprietary, sustainable building material with low carbon footprint.

article thumbnail

Electrify America to install 2,800 charging stations at workplaces and multi-unit dwellings across US

Green Car Congress

Electrify America LLC announced it will install more than 2,800 workplace and residential charging stations by June 2019 in 17 of the biggest metropolitan areas in the United States. Joining Electrify America in this initiative are SemaConnect, EV Connect and Greenlots. Earlier post.).

article thumbnail

EVgo and ABB install first 150 kW fast charger in US, with potential upgrade to 350 kW

Green Car Congress

The installed system has the potential to reach charging speeds of up to 350kW with an upgrade. EVgo will use the station to study utility impacts, installation standards, permitting, and building and safety requirements. The High-Power charging station utilizes a CCS connection standard but is not open to the public.

article thumbnail

Blue Bird, Fulton Co. Schools join Audi, Applied Information on connected vehicle deployment to boost school bus and school zone safety

Green Car Congress

When active, roadside units (RSU) installed in school zone safety beacons—flashing signs that are intended to slow drivers down as they pass by a school—will broadcast messages to development vehicles indicating the location of the school and the reduced speed limit. Temple, Inc., Temple, Inc.,

Audi 243