Remove Available Remove DC Remove Information Remove Maintenance
article thumbnail

Lightning Systems debuts new electric Ford F-550 for shuttle buses, delivery trucks

Green Car Congress

The new Lightning Electric Ford F-550 will be available in gross vehicle weight ratings (GVWR) of 17,500 to 19,500 pounds. There is a five-year, 60,000-mile warranty on the powertrain with maintenance performed by certified local service providers. Additional incentive programs are available in other states as well.

Ford 522
article thumbnail

Electrify Commercial collaborating with Arizona Public Service to provide statewide ultra-fast charging stations

Green Car Congress

This information will help us design products and services that meet the long-term needs of EV owners and drivers. Electrify America is the US’ largest open DC fast-charging network, and holds the distinction of receiving Charged EV Magazine’s “2020 Best in Test” award for its charging infrastructure.

Arizona 221
article thumbnail

Electrify America installing 150/350 kW fast chargers at more than 100 Walmart locations

Green Car Congress

The Electrify America charging systems located at Walmart stores will offer the first certified cooled-cable 150 to 350 kilowatt (kW) DC Fast Chargers. Electric vehicle chargers that offer this kind of power deliver energy for up to 20 miles of range per minute, which is seven times faster than today’s 50 kW DC chargers.

America 258
article thumbnail

Audi of America, Virginia DOT and Qualcomm plan initial C-V2X deployment in Virginia

Green Car Congress

Unique properties of basic C-V2X will be used to deliver work zone warnings on highways as well as signal timing information on approaches to signalized intersections on arterial roadways. These vehicles have the Audi Traffic Light Information (TLI) service that can provide drivers a countdown to the green light.

Virginia 243
article thumbnail

Choosing an Electric Vehicle Charging Station Contractor in 2023

Setec Powerr

Given the intricacies involved in the installation and maintenance of EV charging stations, hiring a qualified contractor is essential. They also offer ongoing maintenance and support services, ensuring that the charging stations are safe, compliant, and efficient. Why Do We Need an EV Charging Station Contractor?

article thumbnail

How to Invest in EV Charging Stations?

Setec Powerr

Consider factors such as the number of electric vehicles in your region, the growth rate of the EV market, and the availability of charging stations. This step will help you define your goals and make informed decisions about your investment. There are three main types to consider: Level 1, Level 2, and DC fast charging.

article thumbnail

Lightning Systems introduces new Class 6 electric powertrain; first 50 ordered by Zeem for Chevrolet 6500XD

Green Car Congress

The Lightning Electric heavy-duty powertrain will be available in the 19,501-26,000 pound gross vehicle weight rating (GVWR) (Class 6) and will deliver an all-electric range of 110 miles. The powertrain is available on new Class 6 trucks as well as for repowers of vehicles currently in fleets.

Chevrolet 150