Remove Grant Remove Installation Remove Maintenance Remove Miles
article thumbnail

Bosch testing fuel cell vans using its own fuel cell components

Green Car Congress

Accommodating the fuel cell components in the available installation space was a major challenge. After the required technical tests, the vehicles were granted official approval for road use. Even loaded, the vehicles can travel up to 335 miles and are fully refueled again in six minutes.

Fuel 195
article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

Here’s what you need to know installing EV charging stations at your c-store or truck stop. While the Blink-Owned model is a full turnkey solution that includes installation, our popular Host Owned model is often chosen by businesses who wish to maintain ownership and control over their chargers. Not located in a designated AFC?

Store 95
article thumbnail

Lightning Systems accepting orders for LightningElectric battery-electric upfit for Ford Transit; price and specs

Green Car Congress

In the United States, the electric-vehicle conversion costs $69,000 for vehicles with an electric range of 50 miles and $89,000 for vehicles with a range of 100 miles. Vouchers and grants are available in some regions for zero-emissions vehicles. Installation can be completed in just hours by certified installers.

Ford 186
article thumbnail

Porterville, CA orders ten 40' all-electric buses from GreenPower; option for 20 more

Green Car Congress

The order includes 11 charging systems to be installed at the maintenance facility and transit center for a total purchase price of approximately $9 million. The funds for the acquisition were granted from the competitive California Air Resources Board (ARB) Zero-Emission Truck and Bus Pilot Program.

article thumbnail

AmeriPride Services receives first of 10 new electric delivery trucks from Motiv Power Systems; 20% of fleet to go electric

Green Car Congress

The company’s new delivery vehicles feature up to 20% gradeability, 80 miles of range and a 50% battery charge time of 2.5 Installed by Morgan Olson on a Ford F59 Chassis, the walk-in step vans are the first Motiv-powered vehicles installed on a previously-used body. Motiv has delivered the first of ten zero-emission step vans.

Fleet 150
article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

Businesses like convenience stores and truck stops are poised to take advantage of the current increase of EVs by installing public EV charging infrastructure. NEVI funds can be used for EV charging infrastructure: acquisition, installation, network connection, operation, maintenance, and long-term EV charging station data sharing.

Store 52
article thumbnail

The Boring Company Vegas Loop gets approval from Commissioners

Teslarati

The Board granted TBC a franchise agreement on Wednesday, October 20, 2021. As per the agreement, the tunneling company has permission to install and operate a Monorail part of the Vegas Loop. The Vegas Loop will span 29 miles with 51 stations and the capacity to accommodate up to 57,000 passengers per hour.

Las Vegas 145