article thumbnail

GMC’s 2024 Sierra EV Denali Edition 1 is finally here – with a 440-mile range

Baua Electric

Photo: GMC GMC’s premium, limited-edition 2024 Sierra EV Denali Edition 1 will launch with a GM-estimated 440-mile range this summer. Deliveries of the 2024 Sierra EV Denali Edition 1 are expected to start this summer at a final starting MSRP of $99,495 (including $1,995 DFC). Get started here. –ad*

Sierra 52
article thumbnail

Apex Clean Energy ordering 19 electrified F-series pickups from XL Fleet

Green Car Congress

Apex is a leading clean energy company that develops, constructs, and operates utility-scale wind and solar power facilities throughout North America. Apex is planning to deploy the plug-in hybrid vehicles to its operations employees, who will have access to charging infrastructure being installed at operational wind and solar facilities.

Fleet 243
article thumbnail

New England to become the second coal-free region in the US

Baua Electric

That’s following a settlement between Sierra Club, The Conservation Law Foundation, EPA, and Granite Shore Power. Schiller Station (pictured), which is on the coast, will host a solar and battery storage system. There’s almost 33 GW of wind, solar, and storage planned for New England. That’s equivalent to taking more than 3.1

Coal 52
article thumbnail

Diesel-Killing Locomotive Of The Future Runs On Solar Power

CleanTechnica EVs

This rolling sheet of solar panels may not look like much, but it could help spark a solar power revolution in the railroad industry.

Solar 105
article thumbnail

You can power your home for 21 days with a Chevy Silverado EV and GM’s new bidirectional charger

Baua Electric

But it’s comparable to other battery storage costs – a Powerwall costs $11,500 with a solar installation through Tesla – and GM’s system eliminates the need to install battery storage. That will include the 2024 Sierra EV Denali, the 2024 Chevrolet Blazer EV, the 2024 Chevrolet Equinox EV, and the 2024 Cadillac LYRIQ.

article thumbnail

SpaceX completes 28th commercial resupply mission to ISS

Teslarati

This included a pair of IROSAs (International Space Station Roll Out Solar Arrays) that will provide increased power for the orbiting outpost. A significant note of the Phase 2 contract awarded by NASA, it also included Northrop Grumman Cygnus and Sierra Nevada’s Dream Chaser spaceplane. Follow [link] for the latest.

article thumbnail

Tesla Megapack project breaks ground, Arizona’s largest project yet

Teslarati

The Sierra Estrella energy storage facility, constructed by utility company Salt River Project (SRP) and energy system constructor Plus Power LLC, will be the largest of its kind in Arizona. SRP notes that it is currently constructing more solar projects, which will feed the Megapack system as they come online in the coming years.

Arizona 140