Remove Building Remove Installation Remove Maintenance Remove Standards
article thumbnail

First 35 State plans to build out EV charging infrastructure approved; more than $900M in FY22 and FY23 funding

Green Car Congress

With this early approval, these states can now unlock more than $900 million in NEVI formula funding from FY22 and FY23 to help build EV chargers across approximately 53,000 miles of highway across the country. Approved Plans are available on the FHWA web site.

article thumbnail

MAN supplying mixed medium- and high-speed engines for hybrid foundation/wind turbine installation vessels

Green Car Congress

MAN Energy Solutions has won a fourth order to supply engines to Chinese shipbuilder, COSCO Heavy Industries, in Qidong for the construction of a second F-Class installation vessel used for the installation of offshore wind turbines and foundations. The previous three orders were for engines for two X-class and another F-class vessel.

Wind 259
article thumbnail

How to Save When Building an EV Charging Station

Setec Powerr

However, building an EV charging site is not a straightforward task. Understanding the EV Charging Landscape The first step towards building an EV charging site is understanding the landscape. However, the installation and maintenance of EV chargers can be complex and costly. Will the chargers cause congestion?

article thumbnail

Is It Safe to Install EV Chargers at Gas Stations?

Setec Powerr

Gas stations, with their widespread and convenient locations, have become ideal places to consider installing electric vehicle chargers. Safety Standards Regarding safety standards, the design and installation of EV chargers must follow strict international and domestic safety standards.

article thumbnail

Blink Charging to provide up to 41,500 EV charging stations to USPS

Green Car Congress

The NEMA 3R outdoor-rated enclosure allows flexible installation either indoors or outdoors. Standard 18-foot charging cables (or the optional 25-foot upgrade) can reach around any vehicle, or between parking spaces, allowing greater flexibility for postal locations.

Charging 354
article thumbnail

Vantis and Thales partner to build US’ first statewide drone infrastructure network; BVLOS flights

Green Car Congress

Vantis , North Dakota’s Statewide Unmanned Aircraft Systems Network, will partner with Thales as the long-term systems integrator to build out the UAS (drone) infrastructure across the state. Vantis infrastructure has been installed at key sites in western North Dakota, where testing is currently underway.

article thumbnail

Biden Administration releases EV Charging Action Plan

Green Car Congress

The law includes $5 billion in formula funding for states with a goal to build a national charging network of 500,000 public chargers; 10% is set-aside each year to provide grants to States to help fill gaps in the network. Guidance and Standards for States and Cities. The law also provides $2.5

Charging 334