Remove Building Remove Connected Remove Design Remove Installation
article thumbnail

ZF connected seat belt actively enhances occupant seating position to help mitigate injury in a crash

Green Car Congress

For this purpose, it is connected not only to the sensors but also to the automatic emergency brake assistant and shifts the occupant toward the right position and holds them there during the braking maneuver. This means it can be integrated into many types of car seats without restricting the design.

Connect 195
article thumbnail

SpaceX installs Mechazilla ‘claw’ on Starship launch tower

Teslarati

In the latest chapter of SpaceX’s Starship launch tower chronicle, the company has rolled a claw-like component to the pad and attached the device to the end of the tower’s newly installed Starship ‘quick disconnect’ arm. Tower QD arm installation, August 29th. Special structure in the production yard.

article thumbnail

SpaceX installs rocket-catching arms on Starship’s Florida launch tower

Teslarati

SpaceX has installed a pair of rocket-catching arms on a tower meant to support the first East Coast launches of its next-generation Starship rocket. The company has been building the second of several planned Starship launch sites for more than three years. The tower’s ‘chopsticks’ are far more complex.

Florida 103
article thumbnail

Siemens’ Russelectric adds EV charging to Massachusetts renewable microgrid

Green Car Congress

In 2017, Russelectric installed a renewable, hybrid microgrid at its Hingham location, consisting of grid power, a solar photovoltaic power generation system, an energy storage system, and a diesel generator. These Level 2 charging stations have a capacity to charge electric vehicles at up to 7.2

article thumbnail

Scuderi Group to build and to install LPG-powered split-cycle generator with compressed air storage capability

Green Car Congress

The signing of the agreement begins the process of building and installing the first LPG-powered Scuderi power generator and energy storage systems. Scuderi Group will design and build four liquid propane gas-powered generators with CAES capability that will be sized and optimized according to each building’s requirements.

article thumbnail

Hyundai Motor showcases miniature model of its smart mobility ecosystem

Green Car Congress

On the ground, PBVs can be seen running on the road, traveling around the Hub, becoming part of the building when connecting to the Hub’s docking station. In addition, mirrors are installed on the ceiling of the exhibition space to allow an immersive viewing experience from various angles.

Hyundai 431
article thumbnail

How to Save When Building an EV Charging Station

Setec Powerr

However, building an EV charging site is not a straightforward task. Understanding the EV Charging Landscape The first step towards building an EV charging site is understanding the landscape. However, the installation and maintenance of EV chargers can be complex and costly.