Remove Alternative Fuels Remove Charging Remove DC Remove Installation
article thumbnail

EnviroSpark wins Georgia NEVI awards to install DC fast chargers at Waffle House and Shell station – Charged EVs

Baua Electric

EnviroSpark ’s installers may soon become connoisseurs of hash browns. The company has won a National Electric Vehicle Infrastructure (NEVI) funding award from its home state of Georgia to build four DC fast chargers at a Waffle House in Tifton, and four more at a Shell station in Metter.

Georgia 52
article thumbnail

The US now has 1 DC fast charging station for every 15 gas stations

Baua Electric

Photo: By Wikideas1 – Own work, CC0, [link] DC fast charging station installation is gaining momentum in the US – Q1 2024 saw a 7.6% That’s one DC fast charging station for every 15 gas stations, and Tesla Superchargers make up more than a quarter of them. Charging deserts are quickly being eliminated.

DC 52
article thumbnail

NREL report shows EV charging stations continued strong growth in early 2020

Green Car Congress

of the necessary Level 2 and DC fast EV charging equipment (EVSE), respectively, required to meet projected demand in 2030, have been installed as of Q1 2020. As of Q1 2020, there were 13,627 public and workplace DC fast EVSE and 71,975 public and workplace Level 2 EVSE available in the United States, according to the report.

2020 453
article thumbnail

Waffle House is getting NEVI DC fast chargers in Tennessee

Baua Electric

Photo: Waffle House EV charging company EnviroSpark is installing National Electric Vehicle Infrastructure (NEVI) program DC fast chargers at Waffle House in Lakeland, Tennessee. The NEVI Formula program requires EV charging stations to be available every 50 miles and within one travel mile of the Alternative Fuel Corridor.

article thumbnail

What are the investment opportunities in the Alternative Fuel Corridor Program?

Setec Powerr

Charging facilities and electric vehicle development are positively correlated, and the only way to drive better growth of electric vehicles is to network and scale the construction of charging facilities. Alternative Fuel Corridor. Ready means that the corridor has adequate charging and fueling capability.

article thumbnail

Roadmapping Your Airport EV Charging Installation

Blink Charging

Here’s what you need to know about planning, or “roadmapping,” an EV supply equipment installation at your airport. The first step to build out comprehensive electric vehicle charging infrastructure is to select an EV charging expert that can walk airport administrators and facility managers through the process.

article thumbnail

DOE data show nearly 10,000 workplace chargers have been installed as of Q1 2021

Green Car Congress

Workplace charging stations are private charging stations that are designated for employees only. In that same quarter, Level 1 chargers accounted for about 4% and DC fast chargers accounted for less than 1%. Nearly 95% of workplace chargers were Level 2 as of the first quarter of 2021. Golden, CO, 2021.