Remove Alternative Fuels Remove Building Remove Installation Remove Miles
article thumbnail

What are the investment opportunities in the Alternative Fuel Corridor Program?

Setec Powerr

As more and more major highways are designated as Alternative Fuel Corridors, while electric vehicle charging networks are being accelerated with funding stimulated by bipartisan infrastructure laws. Alternative Fuel Corridor. Alternative Fuel Corridor. We will now sort out the helpful information for you.

article thumbnail

Here’s where Virginia is installing its first 18 NEVI EV chargers

Baua Electric

Photo: Electrify America Virginia is handing out $11.295 million in federal grants to install 18 NEVI-compliant EV chargers – here’s where they’re going. The EV charging stations will be sited along designated Alternative Fuel Corridors of interstates and major highways. Get started here. –ad*

article thumbnail

EnviroSpark wins Georgia NEVI awards to install DC fast chargers at Waffle House and Shell station – Charged EVs

Baua Electric

EnviroSpark ’s installers may soon become connoisseurs of hash browns. The company has won a National Electric Vehicle Infrastructure (NEVI) funding award from its home state of Georgia to build four DC fast chargers at a Waffle House in Tifton, and four more at a Shell station in Metter.

Georgia 52
article thumbnail

FedEx receives first 150 electric delivery vehicles from BrightDrop

Green Car Congress

received its first 150 electric delivery vehicles from BrightDrop, the technology startup from General Motors (GM) focused on decarbonizing last-mile delivery. Powered by GM’s Ultium Platform, the Zevo 600 is designed for last-mile deliveries, with an estimated range of up to 250 miles on a full charge. FedEx Corp.

Vehicles 273
article thumbnail

Euro Parliament Transport Committee backs draft directive mandating expansion of alternative fuel stations; grandfathering CHAdeMO

Green Car Congress

The draft rules aim to reduce dependence on oil and boost take-up of alternative fuels, so as to help achieve a 60% cut in greenhouse gas emissions from transport by 2050. MEPs added a requirement for building up numbers of hydrogen refueling points in member states where they do not yet exist, with a deadline of 31 December 2030.

article thumbnail

Waffle House is getting NEVI DC fast chargers in Tennessee

Baua Electric

Photo: Waffle House EV charging company EnviroSpark is installing National Electric Vehicle Infrastructure (NEVI) program DC fast chargers at Waffle House in Lakeland, Tennessee. The NEVI Formula program requires EV charging stations to be available every 50 miles and within one travel mile of the Alternative Fuel Corridor.

article thumbnail

This map shows where North Carolina’s first NEVI EV charging stations will be

Baua Electric

The federal NEVI program allocates $5 billion over five years to help US states create a network of EV charging stations along designated Alternative Fuel Corridors made up of interstates and major highways. It published the map so developers can apply for the funds the state received to build and operate the EV charging stations.