article thumbnail

Sears Home Services to install Plugless Power inductive charging systems for EVs

Green Car Congress

Sears Home Services, the residential and commercial installation arm of Sears Holdings, recently entered an installation agreement with Evatran, the developer of Plugless Power inductive charging systems for electric vehicles. Sears will also offer commercial installation for electric vehicle fleet owners and managers.

article thumbnail

Michigan-based Meijer installing EV charging stations at stores

Green Car Congress

-based supercenter chain, plans to install electric vehicle charging stations at several of its Michigan stores. The first charging station was unveiled at the Meijer store in Warren, Michigan (not far from the GM Tech Center), and will be followed by stores in Allen Park and Holland, Michigan. based ChargeNow.

Michigan 210
article thumbnail

AeroVironment completes first electric vehicle commercial charging station installations in Hawaii

Green Car Congress

AeroVironment has installed electric vehicle (EV) charging stations at the Marriott Waikiki in Hawaii. The new chargers are part of Hawaii’s growing charging infrastructure currently being deployed to support electric vehicles. The deadline for EV readiness is midnight, 31 December 2011.

Hawaii 210
article thumbnail

Masdar City installs rapid charger

Green Car Congress

Masdar City, a low-carbon low-waste emerging development that aims to be one of the world’s most sustainable cities, has installed a rapid charging station in collaboration with Mitsubishi Heavy Industries Ltd (MHI). Previously, the EVs had to be charged for six hours continuously using standard electrical outlets.

article thumbnail

AMD installs three Coulomb Technologies charging stations at Austin campus

Green Car Congress

AMD has installed three Coulomb-manufactured ChargePoint electric vehicle (EV) charging stations at its Austin “Lone Star” campus for employees, and plans to install additional stations at its Sunnyvale campus in spring 2011. The charging stations have dual outputs that deliver energy simultaneously: a 7.2

Austin 186
article thumbnail

Cracker Barrel to install 24 Ecotality EV charging systems in select Tennessee locations; Level 2 and Fast Charge

Green Car Congress

Cracker Barrel Old Country Store is becoming a major participant in The EV Project and will install 24 Blink electric vehicle (EV) chargers, provided by ECOtality, Inc., The EV Project, designed to increase the adoption of electric vehicles by creating a solid charging infrastructure across the country, is managed by ECOtality.

Tennessee 247
article thumbnail

BP to Install 45 Ecotality Blink DC Fast Charging Stations

Green Car Congress

a partner in The EV Project, will install ECOtality’s Blink electric vehicle (EV) DC Fast Chargers (480 volt 3-Phase AC input)—unveiled at the Business of Plugging In 2010 conference—at 45 BP and ARCO locations. Blink DC Fast Chargers will be available to the public at BP and ARCO locations as early as March of 2011.

DC 210