Remove Design Remove Grid Remove Installation Remove Parts
article thumbnail

Greenlots and Volvo Trucks partner on first installation of chargers for Volvo LIGHTS electrified trucking project

Green Car Congress

Greenlots, a member of the Shell Group and a provider of electric vehicle (EV) charging and energy management solutions, has installed charging infrastructure for a fleet of electrified commercial trucks as part of its ongoing partnership with Volvo Trucks. Heavy-duty fleets have unique charging characteristics and needs.

Volvo 371
article thumbnail

An off-grid solar tracker powers this EV charging station

Baua Electric

Dartmouth College in Hanover, New Hampshire, has installed an off-grid solar tracker EV charging station for its employees. Solaflect Energy , based in Norwich, Vermont, designs and manufactures the Solar EV Charger. Solaflect Energy , based in Norwich, Vermont, designs and manufactures the Solar EV Charger.

Grid 52
article thumbnail

Honda to install stationary fuel cell power station on California campus as first step toward commercialization of zero-emission backup power generation

Green Car Congress

Honda plans to install a stationary fuel cell power station on its corporate campus in Torrance, Calif. This new initiative will leverage Honda’s fuel cell technology expertise as part of the company’s global goal to achieve carbon neutrality for all products and corporate activities by 2050. Plant, Cooling Tower, Grid Inverter.

Honda 221
article thumbnail

Electrify America unveils its first application of megawatt-level energy storage

Green Car Congress

Electrify America recently unveiled its first application of a megawatt-level battery energy storage system (BESS) for electric vehicle (EV) charging stations, building upon the company’s existing BESS installations at more than 150 stations across the US, including more than 100 installations in California.

article thumbnail

Yongsoo OWC pilot plant in Korea is being prepared to produce green hydrogen

Green Car Congress

The Yongsoo wave energy power plant, installed at berth 1 in the Korean Institute KRISO -Wave Energy Test Site (WETS), is preparing to produce green hydrogen from next year, according to a report from Ocean Energy Systems. The KRISO WETS, located in the western part of Jeju Island, has been in operation since 2019.

Hydrogen 522
article thumbnail

False Starts: The Story of Vehicle-to-Grid Power

Cars That Think

They wanted to see whether an electric vehicle could feed electricity back to the grid. The company’s president, Tom Gage , dubbed the system “vehicle to grid” or V2G. And EV owners would become entrepreneurs, selling electricity back to the grid. And indeed, that’s how promoters of vehicle-to-grid technology perceive the EV.

Grid 135
article thumbnail

JSW Energy begins construction as part of its foray into battery storage services – ET Auto

Baua Electric

The project consists of two installations, each with a 500 MWh storage capacity, designed for two hours of storage in one cycle. The project consists of two installations, each with a 500 MWh storage capacity, designed for two hours of storage in one cycle.

Parts 52