Remove Building Remove Grid Remove Installation Remove Maintenance
article thumbnail

How to Save When Building an EV Charging Station

Setec Powerr

However, building an EV charging site is not a straightforward task. Understanding the EV Charging Landscape The first step towards building an EV charging site is understanding the landscape. However, the installation and maintenance of EV chargers can be complex and costly.

article thumbnail

False Starts: The Story of Vehicle-to-Grid Power

Cars That Think

They wanted to see whether an electric vehicle could feed electricity back to the grid. The company’s president, Tom Gage , dubbed the system “vehicle to grid” or V2G. And EV owners would become entrepreneurs, selling electricity back to the grid. And indeed, that’s how promoters of vehicle-to-grid technology perceive the EV.

Grid 138
article thumbnail

Wallbox introduces Quasar 2 next-generation bidirectional home charger at CES 2022

Green Car Congress

As well as enabling EV owners to charge and discharge their electric vehicle to power their home or the grid, Wallbox’s latest innovation is designed to give EV drivers the ability to isolate their home from the grid and use their EV for backup power during a blackout. With Quasar, your EV energy goes beyond driving.

Grid 293
article thumbnail

Skanska is about to transform a Brooklyn marine terminal into a major offshore wind hub

Baua Electric

The project scope at the 73-acre South Brooklyn Marine Terminal includes existing building demolition, ground improvements to support the staging of wind turbine components, underground utility installation, and the installation of two new heavy-lift crane pads. There will also be significant waterfront and marine upgrades.

Mariner 52
article thumbnail

How LEED v4.1 Provides Points for EV Charging

Blink Charging

Since then, the United States Green Building Council, the organization that administers LEED, has released the latest version of the environmental accreditation: LEED v4.1. Let’s look at how installing EVSE can support your building’s accreditation in LEED v4.1.

article thumbnail

Tesla Lathrop Megafactory spotted with 326 Megapack batteries

Teslarati

Designed for grid-scale projects, the Megapack is offered in two configurations : a 2-hour version offering 1.9 With installation charges, the 2-hour variant is priced at $2,081,060, while the 4-hour variant is priced at $1,865,370. A lot of this growth would be due to the Megapack battery, Tesla’s flagship energy storage product.

article thumbnail

EV Smart Charging Regulations Protect the Grid and Optimize the Charging Experience

Driivz

In this blog we will look at what those regulations are and their implications on building and operating an EV charging business. . Real-time energy metering and communications to ensure the stability of the grid and optimize charging for the benefit of the grid and the consumer . Adoption of technical standards .