Remove Articles Remove Connect Remove DC Remove Installation
article thumbnail

How to install EV chargers at the workplace? | EVBox

EV Box

Regardless of the type or model of charger you choose (or how much one costs ), installing EV charging stations is always a job for a qualified professional. Installing electric vehicle (EV) charging stations at the workplace is not a one-size-fits-all situation, and the best charging solution depends on your location and its specifics.

article thumbnail

The difference between AC charging piles and DC charging piles

Setec Powerr

The charging pile is a charging facility for “refueling” electric vehicles, and the scientific name is also called “off-board charger” At present, charging piles are divided into AC charging piles and DC charging piles. This article will introduce the difference between AC charging piles and DC charging piles.

DC 52
article thumbnail

What is Charge Point Operator(CPO)?

Setec Powerr

However, as we will discover a little later in the article: just as a chef might opt to own or part-own their restaurant, the roles of CPO, EMSP, and owner can also sometimes overlap. Preparing the chosen site for installation of the charge points. what does a Charge Point Operato do? the local electricity grid).

article thumbnail

Wallbox Complies with AFIR: Your Guide to Regulation-Ready Charging Solutions

Wallbox

The Quasar 2 bi-directional EV charger, providing backup power during outages Regulation Summary: AFIR ( Alternative Fuels Infrastructure Regulation ) sets forth requirements for publicly accessible recharging points, both AC and DC, across the European Union. – I have chargers in stock which will be installed after April 13, 2024.

article thumbnail

Wallbox Complies with AFIR: Your Guide to Regulation-Ready Charging Solutions

Wallbox

Supernova’s payment terminal solution and display made it AFIR compliant Regulation Summary: AFIR ( Alternative Fuels Infrastructure Regulation ) sets forth requirements for publicly accessible recharging points, both AC and DC, across the European Union. – I have chargers in stock which will be installed after April 13, 2024.

article thumbnail

ConnectDER and Siemens Partner to offer a simple and clever solution for Level 2 charging installations  

Charged EVs

ConnectDER’s meter collar working together with Siemens’s charging station could save up to 80 percent of installation costs. For many, especially those who live in older homes, installing a home Level 2 charging station may require an upgrade to the home’s electrical service, and/or a new panel (breaker box).

article thumbnail

AFIR: Your Guide to EV Charging Regulations

Wallbox

Supernova’s payment terminal solution and display made it compliant with EV charging regulations EV Charging Regulations Summary: AFIR ( Alternative Fuels Infrastructure Regulation ) sets forth requirements for publicly accessible recharging points, both AC and DC, across the European Union. What can I do?