Remove Affordable Remove Available Remove Building Remove Michigan
article thumbnail

Ford investing $3.5B to build LFP battery plant in Michigan; partnering with CATL

Green Car Congress

billion to build the country’s first automaker-backed LFP battery plant, offering customers a second battery technology within Ford’s EV lineup. Ford is now commited to build both nickel cobalt manganese (NCM) and lithium iron phosphate (LFP) batteries in the US. Ford will invest $3.5 With this $3.5-billion With this $3.5-billion

Michigan 259
article thumbnail

J.D. Power: US growing increasingly divided on EV adoption

Green Car Congress

Increasingly, the US is splitting into two camps when it comes to EV adoption: those states who’ve been aggressive about offering incentives and building infrastructure to support EVs and those that have not. Similarly, South Dakota is projected to reach just 35% share and Michigan is projected to reach 41% share by 2035.

article thumbnail

GM begins deliveries of first Ultium-based EVs: GMC Hummer pickup and Brightdrop EV600

Green Car Congress

This dedicated EV architecture and propulsion system is the foundation for GM’s all-electric future, giving the company the capability not only to build an entire retail and commercial portfolio, but also leverage the technology to expand its business to non-automotive applications. million to benefit the Tunnel to Towers Foundation.

Hummer 459
article thumbnail

Ford cutting price of F-150 Lightning by up to almost $10k

Green Car Congress

The Rouge Electric Vehicle Center in Michigan is temporarily closed to complete final plant upgrades to triple the plant’s annual run rate to a targeted 150,000 F-150 Lightning trucks beginning this fall.

F-150 150
article thumbnail

GM reveals new Ultium batteries and flexible global platform for rapid growth of EV lineup

Green Car Congress

At an event in the GM Tech Center campus in Warren, Michigan, General Motors unveiled the core of its new strategy to grow the company’s EV sales quickly, efficiently and profitably. billion joint venture plant that GM and LG Chem plan to build in Lordstown, Ohio. GM’s all-new modular platform and battery system, Ultium.

GM 362
article thumbnail

Ford drastically cuts workforce at F-150 Lightning EV plant amid ‘much slower’ demand

Baua Electric

Starting April 1, one-third of the workforce will remain on-site at Ford’s Rouge EV plant in Michigan. Enoch told The Detroit Free Press that 700 workers will be transferred to its Michigan Assembly plant to help build the Bronco and Ranger. Smaller, more affordable ones will win in the long run. It starts at $73,495.

F-150 52
article thumbnail

GM bids farewell to the Chevy Bolt, bringing closure to its best-selling EV

Teslarati

The Orion Assembly Plant in Michigan , where the Bolt has been manufactured, “will be retooled in preparation for production of Chevy Silverado and GMC Sierra trucks” next year. However, Barra said its strategy is to ramp up production to build 600,000 electric trucks annually at the Orion plant.

GM 139