Remove Building Remove California Remove Grid Remove Solar
article thumbnail

Electrify America unveils its first application of megawatt-level energy storage

Green Car Congress

Electrify America recently unveiled its first application of a megawatt-level battery energy storage system (BESS) for electric vehicle (EV) charging stations, building upon the company’s existing BESS installations at more than 150 stations across the US, including more than 100 installations in California.

article thumbnail

Fusion Fuel and Electus Energy to develop 75 MW green hydrogen project in Bakersfield, California; Fusion Fuel’s first US project

Green Car Congress

Fusion Fuel and Electus Energy have entered into an exclusive joint venture agreement to develop a large-scale green hydrogen project in Bakersfield, California. The companies have already entered into a land-lease agreement to secure 320 acres in Kern County, California for the project’s development.

Fusion 284
article thumbnail

California agencies release report charting path to 100% clean electricity; need to triple grid capacity by 2045

Green Car Congress

The California Energy Commission (CEC), California Public Utilities Commission (CPUC) and California Air Resources Board (CARB) released the first joint agency report and a summary document examining how the state’s electricity system can become carbon-free by 2045.

Clean 170
article thumbnail

Avangrid just broke ground on its first solar farm in California

Baua Electric

Photo courtesy of Tom Brewster/BLM California Avangrid (NYSE: AGR), one of the US’s largest clean energy operators, has begun construction on its first solar farm in California. GW of installed capacity of renewables in the US, is building the 57-megawatt (MW) Camino Solar Project in Kern County, California.

Solar 52
article thumbnail

Costco warehouse installs off-grid solar to power its EV fleet – Charged EVs

Baua Electric

Retail giant Costco has installed on-site solar generation at a new electric truck charging project in southern California. Costco contracted Washington-based Trinity Structures to design and build an off-grid rooftop solar system at its distribution center in Mira Loma.

Grid 52
article thumbnail

Profiteering Hampers U.S. Grid Expansion

Cars That Think

The United States is not building enough transmission lines to connect regional power networks. The deficit is driving up electricity prices, reducing grid reliability, and hobbling renewable energy deployment. grids demands public scrutiny and accountability. Their grip over the backbone of U.S.

Grid 138
article thumbnail

Tesla Megapacks to be deployed at Apple’s California solar farm

Teslarati

In an announcement on Wednesday, tech giant Apple revealed that it is building a big battery storage project at a Northern California solar farm. The project will also store energy gathered from the California Flats, a 130 MW solar farm. The Teslarati team would appreciate hearing from you.

Solar 145