article thumbnail

This 408-MW solar farm will be one of the largest in Texas

Electrek

Solar developer Primergy Solar has closed commitments for $588 million in debt financing for a 408-megawatt (MW) solar farm south of Dallas–Fort Worth, Texas.

article thumbnail

EGEB: Texas gets a new 250 MW solar farm near Dallas-Fort Worth

Electrek

In today’s Electrek Green Energy Brief (EGEB): Duke Energy Sustainable Solutions breaks ground on its largest solar project to date, in Texas. UnderstandSolar is a free service that links you to top-rated solar installers in your region for personalized solar estimates. Click here to learn more and get your quotes. — *ad.

article thumbnail

Texas installs another big solar + battery storage project

Baua Electric

Photo: Enel North America Power-hungry Texas needs solar and battery storage to help meet demand and balance the grid, so its largest utility-scale storage operator is delivering. Enel North America has started constructing the Ables Springs Solar + Storage Project in Kaufman County, near Dallas. Get started here. –ad*

Texas 52
article thumbnail

EOS Linx Expanding Solar-Powered Charging in Texas

CleanTechnica EVs

EOS Linx, an EV charging company known for its solar-assisted EV charging stations, is about to majorly expand at Texas convenience stores by partnering with the Lone Star Business Association Cooperative (LSBAC), a network of gas/convenience stores in the Dallas-Fort Worth area and north-central Texas.

Texas 87
article thumbnail

This 408-MW solar farm will be one of the largest in Texas

Baua Electric

Photo: Primergy Solar Solar developer Primergy Solar has closed commitments for $588 million in debt financing for a 408-megawatt (MW) solar farm south of Dallas–Fort Worth, Texas. Orion Power Generation originally developed Ash Creek Solar; Primergy acquired the project in 2021. Get started here. –ad*

Texas 52
article thumbnail

This rooftop wind-powered microgrid withstood 105 mph gusts

Electrek

Dallas-based Hover Energy, which makes wind-powered microgrids with solar and storage, is going to begin commercial-scale production in January 2023. And potential customers can feel confident about the resiliency of the company’s rooftop-mounted microgrids – one survived 105 mph winds during Hurricane Ian.

MPH 110
article thumbnail

31 Things to Do for the 2024 Total Solar Eclipse

Baua Electric

Delta Air Lines has been advertising path-of-totality flights from Austin (sold out) and Dallas-Fort Worth to Detroit. The post 31 Things to Do for the 2024 Total Solar Eclipse appeared first on Bauaelectric Auto News. Southwest Airlines (which is running a sweepstakes to win a seat) also offers scheduled flights along the path.

Solar 52