Remove Connect Remove Installation Remove Maintenance Remove Washington
article thumbnail

U Alabama study finds LTE C-V2N and DSRC connected vehicle latency approximately equivalent for infrastructure messages

Green Car Congress

A side-by-side comparison of connected vehicle technology at 85 traffic signals in the Tuscaloosa, AL area showed that latency in delivering safety messages from roadside units (RSUs) to vehicles via dedicated short range radios (DSRC) and LTE cellular (C-V2N) was “approximately equivalent,” according to a study by the University of Alabama.

Alabama 191
article thumbnail

DOE awarding $35M to 11 projects for hydrokinetic turbine development; ARPA-E SHARKS

Green Car Congress

Projects are encouraged to apply concurrent (as opposed to sequential) design methodologies: control co-design, co-design, and designing for operation and maintenance. They will incorporate experts in hydrodynamics, structural dynamics, control systems, power electronics, grid connections, and performance optimization.

Mariner 418
article thumbnail

In-Home Solar: How Many Panels to Fully Charge Your EV?

Setec Powerr

For example, a 300-watt solar panel under ideal conditions can generate 300 watts of power per hour, but in reality, due to various factors such as weather conditions and installation angles, its actual output may be less. This data can be obtained by consulting local solar resource maps or by contacting solar installation companies.

Solar 52
article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

To help facilitate this goal, the Department of Transportation is building a network of 500,000 EV chargers to connect the country along its network of interstate highways by 2030. Here’s what you need to know installing EV charging stations at your c-store or truck stop. Not located in a designated AFC?

Store 95
article thumbnail

IMW Industries introduces mobile CNG Station for fueling small to mid-size fleets

Green Car Congress

Offering both time-fill and fast-fill fueling capabilities, the natural gas compression/dispensing system is mounted on a 24-foot trailer for quick deployment to fleet locations across the country to provide CNG fueling for new fleets or while a permanent station is under construction or undergoing equipment maintenance.

Fleet 199
article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

Businesses like convenience stores and truck stops are poised to take advantage of the current increase of EVs by installing public EV charging infrastructure. National Electric Vehicle Infrastructure (NEVI) Program Each of the 50 states, Washington, DC, and Puerto Rico was allocated funds to distribute to eligible businesses.

Store 52
article thumbnail

Testimony: Why I like my electric vehicle

Electric Auto Association

As gas engine powertrains typically have 100 times the number of parts of an EV powertrain, I have only paid $300 for maintenance: comprising three tire rotations and one cabin air filter, after four years of ownership. My EV battery is warrantied for a minimum of 100K miles and eight years. There is so much to love about driving electric!