Remove Oil-Sands Remove Resource Remove Store Remove Water
article thumbnail

Utah Water Quality Board upholds issuance of permit for oil sands mine in Utah

Green Car Congress

The Utah Water Quality Board, in a 9-2 vote this week, agreed with the August 2012 recommendations of an administrative law judge (ALJ) upholding a permit-by-rule issued by the Division of Water Quality (DWQ) for the proposed PR Spring an oil sands mine on state land in eastern Utah. Source: USOS, DWQ. Click to enlarge.

Oil-Sands 210
article thumbnail

Study concludes permanent loss of peatlands in open-pit oil sands mining adds significantly to carbon burden of oil sands production

Green Car Congress

Researchers at the University of Alberta (Canada) have quantified the transformation of the boreal landscape by open-pit oil sands mining in Alberta, Canada to evaluate its effect on carbon storage and sequestration. million metric tons of stored carbon. point out in their paper. —Rooney et al.

Oil-Sands 270
article thumbnail

Penn State team develops more environmentally friendly method for separating bitumen or oil from sands using ionic liquids

Green Car Congress

Separation of bitumen from a Canadian oil sand sample using an ionic liquid. A team of researchers at Penn State has developed a new, more environmentally friendly method of separating bitumen from oil sands utilizing ionic liquids (IL). Oil sands represent approximately two-thirds of the world’s estimated oil reserves.

Oil-Sands 257
article thumbnail

GE providing produced water handling systems to Blackgold Oil Sands Project; new solidification process for disposal of SAGD waste

Green Car Congress

GS Engineering & Construction (GS E&C) has selected GE to supply the produced water evaporation and zero liquid discharge (ZLD) system for the Blackgold Oil Sands project, located near Conklin, Alberta. Blackgold is owned and operated by a subsidiary of the Korean National Oil Corp.

Oil-Sands 186
article thumbnail

Shell secures C$865M funding for Canadian CO2 storage project; >1M tonnes/yr from oil sands

Green Car Congress

The carbon capture process at the Scotford oil sands upgrader will capture about 35% of emissions. water vessels, the triethylene glycol dehydration unit, and. cm) pipeline to injection wells north of Shell Scotford and permanently stored more than two kilometers (1.24 Click to enlarge. Earlier post.)

Oil-Sands 186
article thumbnail

SwRI, UTSA researchers show biochar is low-cost, effective method to treat fracking water

Green Car Congress

Researchers at Southwest Research Institute (SwRI) and The University of Texas at San Antonio (UTSA) have determined that biochar, a substance produced from plant matter, is a safe, effective and inexpensive method to treat flowback water following hydraulic fracturing, or fracking. —Maoqi Feng, SwRI.

Water 257
article thumbnail

Study finds that native microbes biodegrade longer-chain hydrocarbons in oil sands tailings to methane; implications for management of tailings and GHG emissions from tailings ponds

Green Car Congress

Proposed anaerobic hydrocarbon biodegradation pathways in oil sands tailings. The researchers now report that higher molecular weight n -alkanes (C 14 , C 16 , and C 18 ) are also degraded under methanogenic conditions in oil sands tailings, albeit after a lengthy lag (180 days) before the onset of methanogenesis.

Oil-Sands 186