Remove Installation Remove Oil Remove Oil-Sands Remove Water
article thumbnail

Canada and Alberta introduce joint plan for improved environmental monitoring in the oil sands

Green Car Congress

Proposed oil sands monitoring by 2015. The Government of Canada and Government of Alberta unveiled “The Joint Canada-Alberta Implementation Plan for Oil Sands Monitoring” in a partnership to improve environmental monitoring in the oil sands region with a program that will sample more sites for more substances more frequently.

Oil-Sands 274
article thumbnail

Early improvements in place for Alberta oil sands monitoring program

Green Car Congress

Canada’s Environment Minister Peter Kent, and Alberta’s Environment and Sustainable Resource Development Minister Diana McQueen toured several of the new oil sands monitoring stations now in place in the early stages of implementation of the Joint Canada-Alberta Implementation Plan for Oil Sands Monitoring.

Oil-Sands 236
article thumbnail

Canadian oil sands project to recycle up to 97% of its produced water with GE evaporation technology

Green Car Congress

Grizzly Oil Sands ULC has selected GE’s (NYSE: GE) produced water evaporation technology for its Algar Lake project near Fort McMurray, Alberta, Canada. Until recently, SAGD produced water could not be recycled as boiler feedwater because conventional treatment technologies were unable to produce the necessary water quality.

Oil-Sands 210
article thumbnail

GE providing produced water handling systems to Blackgold Oil Sands Project; new solidification process for disposal of SAGD waste

Green Car Congress

GS Engineering & Construction (GS E&C) has selected GE to supply the produced water evaporation and zero liquid discharge (ZLD) system for the Blackgold Oil Sands project, located near Conklin, Alberta. Blackgold is owned and operated by a subsidiary of the Korean National Oil Corp.

Oil-Sands 186
article thumbnail

ExxonMobil brings Kearl oil sands expansion online ahead of schedule; overall capacity doubling to 220K barrels per day

Green Car Congress

Exxon Mobil has started production at its Kearl oil sands expansion project in Alberta, Canada ahead of schedule; the expansion is expected to double overall capacity to 220,000 barrels of bitumen a day, with the expansion itself ultimately expected to reach 110,000 barrels per day. Kearl will access approximately 4.6 Earlier post.).

Oil-Sands 150
article thumbnail

Stanford, UC Santa Cruz study explores ramifications of demand-driven peak to conventional oil

Green Car Congress

In contrast to arguments that peak conventional oil production is imminent due to physical resource scarcity, a team from Stanford University and UC Santa Cruz has examined the alternative possibility of reduced oil use due to improved efficiency and oil substitution. 2010, to above 140 $/bbl in constant 2010 dollars).

Oil 207
article thumbnail

ESP artificial lift company ZiLift secures £4M capital investment led by GE-NRG Energy-ConocoPhillips JV

Green Car Congress

Oil and gas services company Schlumberger defines artificial lift as any system that adds energy to the fluid column in a wellbore with the objective of initiating and improving production from the well. maglift de-waterers deeper mature wells, and supports retrofit installation through small diameter production tubing.

Oil-Sands 210