Remove Electrical Remove Energy Grid Remove Energy Storage Remove Powered
article thumbnail

Ford F-150 Lightning’s V2G charging will help power NC energy grid

Teslarati

Duke Energy, a North Carolina-based energy provider, is aiming to utilize the Ford F-150 Lightning to help reduce stress on the state’s energy grid. Participants will have to have the Ford Charge Station Pro home charger and Ford’s Intelligent Backup Power Home Integration System installed in their houses.

F-150 111
article thumbnail

BMW i home energy storage system integrates 2nd-life i3 vehicle batteries

Green Car Congress

BMW i announced a home stationary energy storage system solution integrating its BMW i3 vehicle battery at EVS 29 in Montréal. The concept announced at EVS29 is the first market-ready home storage system using a second-life automotive BMW i3 high-voltage battery integrated by BECK Automation (Würzburg, Germany).

article thumbnail

Mercedes-Benz Energy, Beijing Electric Vehicle start development partnership on 2nd-life battery storage

Green Car Congress

Daimler AG, with its wholly owned subsidiary Mercedes-Benz Energy GmbH, and Beijing Electric Vehicle Co., BJEV), a subsidiary of the BAIC Group, have entered into a development partnership to establish second-life energy storage systems in China in the future. Beijing Electric Vehicle Co.,

Mercedes 207
article thumbnail

Li-ion Supplier Saft Partners with Apollo Solar on US DOE Solar Energy Grid Integration Systems (SEGIS) Project

Green Car Congress

Saft is supplying a lithium-ion battery system to provide energy storage for one of the Solar Energy Grid Integration Systems (SEGIS) projects funded by the US Department of Energy (DOE). The design will incorporate energy storage and two-way communications between solar electrical systems and utilities.

Li-ion 210
article thumbnail

UC Riverside opening Sustainable Integrated Grid Initiative; integration of solar energy, battery storage and electric and hybrid vehicles

Green Car Congress

Schematic of the “New Grid Testbed” components, including renewable energy generation, energy storage, smart distribution and electric transportation Click to enlarge. It is the largest renewable energy project of its kind in California. Two megawatt-hours of battery energy storage.

Grid 287
article thumbnail

Partners begin work on Energiepark Mainz; hydrogen from renewable sources; power-to-gas

Green Car Congress

Germany’s Minister of Economics and Technology, Sigmar Gabriel, together with representatives of power utility Stadtwerke Mainz AG, Siemens AG, The Linde Group and RheinMain University of Applied Sciences, inaugurated the construction of the Energiepark Mainz. This makes it possible to store electricity from renewable energy sources.

Hydrogen 250
article thumbnail

Tesla Megapack-powered BESS at Moss Landing commissioned to PG&E’s grid

Teslarati

Today, Pacific Gas and Electric announced that it has commissioned its 182.5-megawatt megawatt Tesla Megapack battery energy storage system (BESS) located at Moss Landing, which officially certifies the project to join the company’s grid. MW for up to four hours during times of high demand.

Grid 98