article thumbnail

BMW Group and Solid Power deepen joint development partnership with R&D license and prototype line

Green Car Congress

Under an expanded Joint Development Agreement, BMW Group and Solid Power have added a research and development license as a basis for their common next steps. This license enables BMW to establish an all solid-state battery (ASSB) prototype line in its Cell Manufacturing Competence Center (CMCC) in Parsdorf near Munich.

BMW 448
article thumbnail

Solid Power installs EV cell pilot line; 300 cells per week

Green Car Congress

Solid Power, a developer of all-solid-state battery cells for electric vehicles, has completed installation of its pilot production line—dubbed the “EV cell pilot line”—which is designed to produce EV-scale solid-state cells. —Derek Johnson, Chief Operating Officer at Solid Power.

article thumbnail

Solid Power and BMW deepen joint development partnership with license to cell design and manufacturing know-how

Green Car Congress

Solid Power, a developer of all-solid-state battery and sulfide-based electrolyte technology, has deepened its partnership with the BMW Group. Under an expanded Joint Development Agreement, Solid Power has granted the BMW Group a research and development license to Solid Power’s all-solid-state cell design and manufacturing know-how.

BMW 199
article thumbnail

End of production for BMW i3; 250,000 units over 8 and a half years

Green Car Congress

The serial production of the BMW i3 has ended , some eight and a half years after it was launched. The BMW i3 (combined power consumption: 16.3 - 15.3 The BMW i3 (combined power consumption: 16.3 - 15.3 This makes the BMW i3 the world’s most successful electric vehicle in the premium compact segment.

BMW 435
article thumbnail

BMW Group investing €800M in Plant San Luis Potosí in Mexico for NEUE KLASSE and battery assembly

Green Car Congress

The BMW Group is investing €800 million in Plant San Luis Potosí in Mexico for integration of fully-electric models of NEUE KLASSE and construction of local high-voltage battery assembly. BMW Group Plant SLP We are systematically gearing our production network towards electromobility. Earlier post.)

Mexico 418
article thumbnail

BMW to produce next-gen e-drives at Steyr engine plant; more than 600k units per year

Green Car Congress

From 2025 onwards, the next generation of BMW e-drives will be manufactured in its engine plant in Steyr, Austria—with both production and development on site—with eventual annual production capacity of more than 600,000 units. The BMW Group’s largest engine plant: Steyr plant in Upper Austria. —Milan Nedeljkovi?,

BMW 434
article thumbnail

BMW and Valeo to co-develop next-generation Level 4 automated parking

Green Car Congress

BMW Group and Valeo are expanding their long-existing relationship with a new partnership. The software functions are based on the current automated parking software stack first launched with the BMW iX in 2021. In the next generation it will be further extended by a powerful computing platform hosting the jointly developed algorithms.

BMW 353