Remove Alternative Fuels Remove Connected Remove Design Remove Maintenance
article thumbnail

CASE unveils first fully electric backhoe loader: the 580 EV

Green Car Congress

The 580 EV is powered by a 480-volt, 90 kWh lithium-ion battery pack that can be charged by any 220-volt/three-phase connection. The new MICHELIN CrossGrip is a multi-purpose radial tire designed for use on the road, grass and snow. —Eric Zieser, director — global compact equipment product line, CASE.

article thumbnail

See the Latest on NEVI 2023

EV Connect

The ambitious program aims to ensure that EV drivers have access to fast charging along the most frequently-traveled routes, which stretch for 75,000 miles along the nation’s Alternative Fuel Corridors (AFCs). Installation, operation and maintenance. Network connectivity of EV charging structure.

article thumbnail

DOE announces $139M in funding for 55 projects to advance innovative vehicle technologies

Green Car Congress

Announced by Secretary Brouillette in January 2020, the Energy Storage Grand Challenge is designed to create and sustain US global leadership in energy storage technology, utilization, and exports. Support mobility technologies such as connected and automated vehicles, as well as innovations in transit. Project description.

article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

To help facilitate this goal, the Department of Transportation is building a network of 500,000 EV chargers to connect the country along its network of interstate highways by 2030. Not located in a designated AFC? The US federal government wants at least 50% of new vehicle sales in the US to be electric by 2030.

Store 95
article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

. $5 billion is allocated for the NEVI program, which will be used by the states for the establishment of an interconnected national network of direct current fast chargers (DCFCs) along designated Alternative Fuel Corridors. Eligible funding amounts : Projects located in alternative fuel corridors: $1,000,000 – no maximum.

Store 52
article thumbnail

Select the Right EV Charging Management Partner for your NEVI Program Project

Driivz

Intended to remove the speedbumps from building a high-speed EV charging network along designated Alternative Fuel Corridors , NEVI grants cover up to 80% of the cost of new or upgraded EV charging infrastructure. connect securely with a charging network, and can receive and implement software updates.

article thumbnail

EV Smart Charging Regulations Protect the Grid and Optimize the Charging Experience

Driivz

Fit for 55 includes the Alternative Fuels Infrastructure Regulation (AFIR) proposal that specifically addresses public EV charging in the EU, establishing required targets for infrastructure in each member country. Charge a vehicle even if the communications network connection goes down .