Remove Buy Remove Los Angeles Remove Maintenance Remove Plug-in
article thumbnail

California Energy Commission awards more than $15M to advance biofuels, plug-in and V2G research

Green Car Congress

based in Valencia (Los Angeles County), will administer the project, and ZeroTruck of Laguna Niguel (Orange County) will build up to 14 trucks for the project. The trucks will be tested in various locations, including Google in the Bay Area, the City of Santa Monica and the Port of Los Angeles. Earlier post.)

article thumbnail

Mitsubishi to debut eight xEVs in next five years: hybrids, plug-in hybrids, EVs

Green Car Congress

Mitsubishi Motors Corporation (MMC) plans to introduce eight hybrid (HEV), plug-in hybrid (PHEV), and battery-powered (BEV) models by fiscal year 2015 in anticipation that demand for low-carbon, fuel-efficient automobiles will expand worldwide. million vehicles by fiscal 2013, as compared to 1 million vehicle sold in the current fiscal year.

article thumbnail

California ARB receives VW’s 1st $200M, 30-month ZEV investment plan

Green Car Congress

Appendix C outlines four areas of qualified investments: ZEV infrastructure (including the development and maintenance of ZEV charging stations), public awareness, increasing ZEV access, and a green city. ARB may approve, partially approve or disapprove the Plan. diesel cars. VW California ZEV Investment Plan: Cycle 1.

article thumbnail

Flash Drive: 2024 Acura ZDX Type S

Clean Fleet Report

But that platform is where Acura strongly says the similarities ends as Acura has added performance bits-and-pieces to the ZDX that makes it unique from those models. GM underneath, but Acura throughout The ZDX comes in a base A-Spec and a performance model called Type S. 313 AER A-Spec All-Wheel Drive (AWD) 490 hp 437 lb.-ft. Rear brakes: 13.5”

Acura 84
article thumbnail

Coulomb Technologies to Provide 4,600 Free Home and Public Charging Stations Through ChargePoint America Program

Green Car Congress

ChargePoint America will provide 4,600 Level II (220 – 240 volts) public and private ChargePoint Networked Charging Stations by October 2011 to program participants in nine regions in the United States: Austin, Texas; Detroit, Michigan; Los Angeles, California; New York, New York; Orlando, Fla.; Tags: Infrastructure Plug-ins.

America 220
article thumbnail

USDOT awarding $55M to support purchase of Low-No buses; electric buses and infrastructure

Green Car Congress

Eligible projects included those that replace, rehabilitate, lease, and purchase buses and related equipment as well as projects to purchase, rehabilitate, construct or lease bus-related facilities, such as buildings for bus storage and maintenance. City of Los Angeles, Department of Transportation. FY2017 Low-No projects.

Purchase 191
article thumbnail

Road Test: 2023 Genesis GV60 EV

Clean Fleet Report

The slowest, a standard 120V household plug, delivers a full charge in about 68 hours (that’s just short of three days). After driving 246 miles through Southern California counties of Los Angeles, Orange and San Diego, we had 30 miles of range remaining on the dash gauge. So Genesis, you did a great job. The magic button.