Remove Buy Remove Los Angeles Remove Maintenance Remove Plug
article thumbnail

California Energy Commission awards more than $15M to advance biofuels, plug-in and V2G research

Green Car Congress

based in Valencia (Los Angeles County), will administer the project, and ZeroTruck of Laguna Niguel (Orange County) will build up to 14 trucks for the project. The trucks will be tested in various locations, including Google in the Bay Area, the City of Santa Monica and the Port of Los Angeles. Electricore Inc.,

article thumbnail

Mitsubishi to debut eight xEVs in next five years: hybrids, plug-in hybrids, EVs

Green Car Congress

Mitsubishi Motors Corporation (MMC) plans to introduce eight hybrid (HEV), plug-in hybrid (PHEV), and battery-powered (BEV) models by fiscal year 2015 in anticipation that demand for low-carbon, fuel-efficient automobiles will expand worldwide. by Jack Rosebro. Mitsubishi will introduce 8 xEVs by FY 2015. Click to enlarge.

article thumbnail

California ARB receives VW’s 1st $200M, 30-month ZEV investment plan

Green Car Congress

Appendix C outlines four areas of qualified investments: ZEV infrastructure (including the development and maintenance of ZEV charging stations), public awareness, increasing ZEV access, and a green city. These stations will focus on 150 kW and 320 kW DC fast chargers; each station will have 5 plugs on average. liter Consent Decree.

article thumbnail

Flash Drive: 2024 Acura ZDX Type S

Clean Fleet Report

The ZDX can be plugged into a 120V common wall plug, but expect replenish times to be long and slow. But consumers shopping for a performance EV, like it or not, this sprint speed just may be their pacing item for what to buy. Go here for the details. miles per hour of charging. Hyundai Ioniq 5 N at 3.1

Acura 85
article thumbnail

Coulomb Technologies to Provide 4,600 Free Home and Public Charging Stations Through ChargePoint America Program

Green Car Congress

ChargePoint America will provide 4,600 Level II (220 – 240 volts) public and private ChargePoint Networked Charging Stations by October 2011 to program participants in nine regions in the United States: Austin, Texas; Detroit, Michigan; Los Angeles, California; New York, New York; Orlando, Fla.; Tags: Infrastructure Plug-ins.

America 220
article thumbnail

USDOT awarding $55M to support purchase of Low-No buses; electric buses and infrastructure

Green Car Congress

Eligible projects included those that replace, rehabilitate, lease, and purchase buses and related equipment as well as projects to purchase, rehabilitate, construct or lease bus-related facilities, such as buildings for bus storage and maintenance. City of Los Angeles, Department of Transportation. FY2017 Low-No projects.

Purchase 191
article thumbnail

Road Test: 2023 Genesis GV60 EV

Clean Fleet Report

The slowest, a standard 120V household plug, delivers a full charge in about 68 hours (that’s just short of three days). After driving 246 miles through Southern California counties of Los Angeles, Orange and San Diego, we had 30 miles of range remaining on the dash gauge. Maintenance – Three years/36,000 miles.