Remove Austin Remove DC Remove Installation Remove Plug-in
article thumbnail

Austin Energy Rebate

Noodoe

Install DC Charging Stations at Your Business Austin Energy rebates help you install the best Noodoe hardware on your property and reimburses your electricity usage. Applications are open  NOW; apply with Noodoe for a site designed according to your needs, the most intuitive equipment, and affordable installation.

Austin 52
article thumbnail

BMW i and EVgo expanding ChargeNow DC Fast program; 500 more fast chargers in US; no-cost DC and Level 2 for BMW i3 drivers

Green Car Congress

At the Los Angeles Auto Show, BMW of North America announced, in cooperation with NRG EVgo, the expansion of the ChargeNow DC Fast program. ChargeNow DC Fast also includes two years of no-cost charging for qualifying BMW i3 drivers in those areas. Earlier post.) —Rob Healey, Head of EV Infrastructure for BMW of North America.

DC 150
article thumbnail

Coulomb Technologies Unveils First ChargePoint America EV Charging Stations in San Jose

Green Car Congress

Coulomb Technologies has installed its first Networked Charging Station for electric vehicles in San Jose, California from its $37 million ChargePoint America program ( earlier post ). The first two ChargePoint America stations are now installed at the McEnery Convention Center Parking Center. Sacramento, Calif., Sacramento, Calif.,

San Jose 170
article thumbnail

Coulomb Technologies to Provide 4,600 Free Home and Public Charging Stations Through ChargePoint America Program

Green Car Congress

ChargePoint America will provide 4,600 Level II (220 – 240 volts) public and private ChargePoint Networked Charging Stations by October 2011 to program participants in nine regions in the United States: Austin, Texas; Detroit, Michigan; Los Angeles, California; New York, New York; Orlando, Fla.; and Washington DC. and Washington DC.

America 220
article thumbnail

Coulomb, MasterCard, and the future of public charging

Plugs and Cars

The charge stations and installations were paid for with federal stimulus and California Energy Commission grants won by Coulomb. And if you're located in California, the California Energy Commission portion of the grant to Coulomb will pay for installation. ChargePoint America is looking for hosts for charge stations. But for whom?

Charging 203
article thumbnail

Obama Administration launches series of actions to accelerate EV adoption; inc. $4.5B in loan guarantees, pursuing 350 kW fast charge

Green Car Congress

During past eight years the number of plug-in electric vehicle models has increased from one to more than 20, battery costs have decreased 70%, and the number of electric vehicle charging stations has increased from less than 500 in 2008 to more than 16,000 today—a 40-fold increase. Among the actions announced are: Unlocking up to $4.5

Obama 150
article thumbnail

SAE International publishes new J2954 wireless charging standard

Green Car Congress

The new standard, SAE J2954 , helps pave the way for charging without the need for plugging in—widely considered to be a key enabler for accelerating the adoption of EVs and autonomous vehicles. The new standard was more than a decade in the making. of Energy (DoE), the U.S. —Jesse Schneider, chair of the SAE J2954 Task Force.

Standards 544