Remove Future Remove Maintenance Remove Neighborhood Remove Parts
article thumbnail

BYD delivers first all-electric automated side loader refuse truck to city of Palo Alto

Green Car Congress

The truck will operate on a variety of service routes in the community from urban to residential neighborhoods including streets with steep inclines. The electric refuse truck has 76 miles of range and requires only two to three hours maximum to fully charge. —Andy Swanton, vice president of truck sales for BYD Heavy Industries.

BYD 150
article thumbnail

Recap: Exhibiting at the Advanced Clean Transportation (ACT) Expo and Honoring Our Customers

EV Connect

was proud to be a part of a record setting Advanced Clean Transportation (ACT) Expo in Long Beach, California. Increased government funding and legislative support at both state and federal levels has large in part contributed to the surge in Expo attendance, along with a general interest in a cleaner and greener future.

Clean 52
article thumbnail

Is it the Right Time to Buy an Electric Car?

Get Electric Vehicle

Maintenance and servicing of your vehicle. Spending a few more bucks on a long-range electric car will certainly pay off in the long run as it requires a lot less maintenance. #2. Maintenance and servicing of your car. Generally, an electric car requires very minimal maintenance since it has few moving parts in it.

Buy 52
article thumbnail

Is Exponential EV Adoption in the U.S. an Expensive Headache for Utilities or an Opportunity for New Revenue?

Driivz

By 2025, some research estimates that 3,000 neighborhoods will not be able to accommodate any more new EV charging points. With a stake in EV charging, they can get direct insights into usage and future needs to plan out those upgrades over the next decade. In many areas, businesses requesting electricity are being denied or postponed.

Grid 52
article thumbnail

How to Prevent a Power Outage From Becoming a Crisis

Cars That Think

On 4 August 2020, a tropical storm knocked out power in many parts of New York City as well as neighboring counties and states. There are technical reasons that contributed to faster repairs in Manhattan, but in general the neighborhoods that waited the longest to have their power restored tended to be poorer and less white.

article thumbnail

LEED Certification and EV Charging Stations: What you need to know

Blink Charging

To gain a LEED point for future EV charging plans, a project must: Make 10% of all parking spaces (or at least 6 spaces) EV Ready. As previously mentioned, LEED uses a tiered rating system that takes into account the design, materials, construction, operation, and maintenance of building projects. How does LEED work?

article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

NEVI funds can be used for EV charging infrastructure: acquisition, installation, network connection, operation, maintenance, and long-term EV charging station data sharing. This is an excellent opportunity for convenience stores and truck stops to get EV chargers and future-proof their businesses. Ready to get started?

Store 52