Piedmont Lithium selects Tennessee for second lithium hydroxide project; 30,000 metric tons per year
Green Car Congress
SEPTEMBER 11, 2022
Conceptual design of the 30,000 TPY Tennessee Lithium plant. Front-End Engineering Design (FEED) for Tennessee Lithium will be performed by Kiewit and Primero. 2024: Ghana Project—spodumene concentrate; preliminary feasibility study (PFS) Q3 2022.
Let's personalize your content