article thumbnail

Electric shuttles to start service in south Sacramento

Green Car Congress

SacRT began piloting the service in February 2018 in partnership with the Franklin Neighborhood Development Corporation using compressed natural gas (CNG) vehicles. Electrify America fully subsidized the costs of the shuttles, the DC fast-charging infrastructure to support them, and the retrofit costs.

article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

Convenience stores and truck stops are in a fantastic position to take advantage of available federal funding for DC fast charging stations. If you prefer EVs to charge for less than an hour, DC fast chargers can help your location serve more drivers per hour. Not located in a designated AFC?

Store 95
article thumbnail

How to Invest in EV Charging Stations?

Setec Powerr

Consider factors such as the cost of installation, operating expenses, and potential revenue from charging fees. Consider installing charging stations in residential neighborhoods, especially in apartment complexes or multi-unit housing. There are three main types to consider: Level 1, Level 2, and DC fast charging.

article thumbnail

Why Electric Buses Are the Healthy School Choice

Blink Charging

What makes school bus fumes especially dangerous is that they often end up making their way into the vehicle cabins , schoolyards and playgrounds, and residential neighborhoods. The tradeoff is in the budget: while faster, DC fast chargers require more power and are more expensive to install.

Fleet 60
article thumbnail

A Comprehensive Guide to EV Charging Management Software Solution

Driivz

Total Cost of Ownership (TCO) : A more reliable and available network leads to reduced CapEx and OpEx resulting in reduced TCO for network operators. Understanding EV Charging Stations Charging stations vary by connector type, use cases and locale, their power rating, and whether they are AC or DC.

article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

National Electric Vehicle Infrastructure (NEVI) Program Each of the 50 states, Washington, DC, and Puerto Rico was allocated funds to distribute to eligible businesses. In addition, funds must be used for the installation of a bank of at least four 150kW DC fast chargers at a given location.

Store 52
article thumbnail

How to make heavy-duty electric trucks work in practice

Charged EVs

But the time and cost of installing the needed charging infrastructure for electric trucks can vary enormously: “from a few thousand dollars for lower-power chargers to millions of dollars for high-power chargers” that can deliver up to 1 megawatt each. A 150 kW charger may recharge a battery pack to 80 percent in about 2.5

Volvo 131