article thumbnail

Tesla’s solar neighborhood in Austin could help TX learn if renewables are viable

Teslarati

The project aims to build the first Tesla Solar neighborhood, making a sustainable residential community. The Tesla Solar neighborhood was provisionally named SunHouse at Easton Park. ” In short, the letter suggested generators shoulder the costs of failure if they fail to meet the power demands of Texans.

article thumbnail

Electric shuttles to start service in south Sacramento

Green Car Congress

SacRT began piloting the service in February 2018 in partnership with the Franklin Neighborhood Development Corporation using compressed natural gas (CNG) vehicles. Electrify America fully subsidized the costs of the shuttles, the DC fast-charging infrastructure to support them, and the retrofit costs. —Richard Steinberg.

article thumbnail

Bollinger Motors unveils DELIVER-E all-electric delivery van

Green Car Congress

The Total Cost of Ownership (TCO) within each class is significantly lower than gas and diesel versions on the road today. Our DELIVER-E van gives commercial fleets the power to go green and save on ownership costs, while neighborhoods will benefit from a reduction in air and noise pollution.

article thumbnail

FHWA publishes final standards for federally funded EV charging infrastructure projects; waiver of Buy America requirements for EV chargers

Green Car Congress

Beginning with EV chargers manufactured on 1 July 2024, FHWA will phase out coverage under this waiver for those previously covered EV chargers where the cost of components manufactured in the United States does not exceed 55% of the cost of all components. Background.

Buy 170
article thumbnail

Tesla proposes deal to help Palo Alto upgrade SRP’s electric infrastructure

Teslarati

Tesla proposes splitting the $24 million cost of the new substation for the SRP area, meaning each party would contribute $12 million to the project. The car manufacturer’s proposal would upgrade SRP power lines and knock out a big chunk of Palo Alto’s electric infrastructure goal.

Tesla 117
article thumbnail

Ambur’s Next Major Development – Chennai-Bengaluru Highway (NH 44), Underway and Set for an Imminent Launch

Baua Electric

The corridor valued at a cost of Rs. 135 crore spans at a length of 1,450 meters and is 11 meters wide Sanctioned in 2011 and currently in progress at a cost of Rs.

article thumbnail

Tesla’s June shipments in China leap as international gross sales clash file

Baua Electric

The electrical-car producer received momentum in the beginning of the time when it slashed costs of its in the neighborhood constructed Fashion 3 sedans and Fashion Y SUVs. The automaker briefly confronted power from native competition, which adopted swimsuit with reductions.