Remove Connecticut Remove Installation Remove Maintenance Remove Range
article thumbnail

Honda cuts US lease price for Fit EV to $259/mo

Green Car Congress

The new three-year lease includes no down payment, unlimited mileage, routine maintenance, collision coverage and 240 volt EV home charging station equipment (not including installation) from Leviton. Fit EV customers also can take advantage of Honda’s partnership with SolarCity to install solar power with no upfront cost.

Honda 218
article thumbnail

Owners of aging Teslas, this new bespoke warranty plan is for you

Baua Electric

EVs require less maintenance than gas cars, but they’re not infallible. The plan offers three coverage levels, and costs range from around $40 to $120 per month. In order to find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage , a free service that makes it easy for you to go solar.

article thumbnail

Ford Mustang Mach-E becomes British Police preference

Teslarati

Several departments in the United States, including Fremont, California, Westport, Connecticut, and Hastings on Hudson, New York , have all added Tesla vehicles to their fleet. However, the addition of a Mach-E seems to be a smart move, especially as lack of maintenance costs and the lack of gas station visits will save the Department money.

Ford 117
article thumbnail

USDOT awarding $55M to support purchase of Low-No buses; electric buses and infrastructure

Green Car Congress

Eligible projects included those that replace, rehabilitate, lease, and purchase buses and related equipment as well as projects to purchase, rehabilitate, construct or lease bus-related facilities, such as buildings for bus storage and maintenance. Connecticut Department of Transportation. FY2017 Low-No projects. Description.

Purchase 191
article thumbnail

US DOT Awards $100M in Recovery Act Funds to 43 Transit Projects to Reduce Energy Consumption and Greenhouse Gas Emissions

Green Car Congress

Laredo Bus Facility Solar Canopies: Provide shade structures with integrated, grid tied photovoltaic cells to be erected on the bus storage lot at the Laredo Bus Maintenance Facility. The largest PV installation in Georgia. Connecticut Department of Transportation, Connecticut: $7,000,000.

Emissions 256
article thumbnail

Road Test: 2023 Genesis GV60 EV

Clean Fleet Report

Most owners will opt to install a 240V Level 2 charger at their home that will replenish 10% to 100% in about seven hours. It is important to note that cold weather can affect the charging time and driving range. The all-electric driving range is affected by driving style, the drive mode and the horsepower between the two models.

article thumbnail

FTA Report on Worldwide H2 Bus Demonstrations Finds Better Than Expected Performance and Strong Customer Acceptance; Challenges Remain

Green Car Congress

Most participants noted that developing fuel cell bus maintenance facilities was not as challenging as expected. Key challenges to commercialization revealed by the demonstrations were: Vehicle Range. The most significant challenge was range. Most participants expressed confidence that the durability challenge will be solved.