Remove Denver Remove Installation Remove Power Remove Resource
article thumbnail

Volvo Cars, Starbucks begin installing ChargePoint EV fast chargers at stores between Denver and Seattle

Green Car Congress

Volvo Cars, in cooperation with Starbucks Corporation, announced the first Starbucks stores where new electric vehicle (EV) chargers, powered by ChargePoint, will be available to customers and members of the public. have been installed and are scheduled to become active later this month.

Seattle 435
article thumbnail

ICCT quantifies the EV charging infrastructure gap across US markets

Green Car Congress

In a new white paper , the International Council on Clean Transportation (ICCT) has quantified the gap in charging infrastructure across the 100 most populous US metropolitan areas in the US to power more than 3 million expected electric vehicles by 2025. Planned infrastructure deployment activities are promising, but uneven. Markets ”.

Market 275
article thumbnail

CleanFUEL USA Secures $12.9 Million from US DOE for 100+ Propane Refueling Stations

Green Car Congress

The program will roll out in two phases and focus on cities that have a presence of existing and potential autogas fleets, autogas fuel availability as well as available staff and resources from the Propane Education & Research Council (PERC). school buses, shuttle buses, medium and light duty trucks, etc.),

USA 218
article thumbnail

How EV Charging Building Codes Help Future-Proof New Developments

Blink Charging

For example, while sprinkler systems have existed since the early 1800s and the first in North America was installed in 1852 , it was not mandatory to install them in new buildings. Sprinkler systems were often ignored, as installation added to the cost of construction.

article thumbnail

First $300M tranche of VW National ZEV investment targets charging infrastructure; 150kW+ fast charging on highway network

Green Car Congress

Chicago, Portland, Boston, Seattle, Philadelphia, Denver, Houston, Miami, and Raleigh—and several highway corridors. Installing charging infrastructure (approximately $250 million); Public Education initiatives (approximately $25 million); and. billion commitment will be spent in $300 million increments over four 30-month cycles.

Charging 150
article thumbnail

Environmental Charter High School Gets Solar; Greenius Goes EcoMedia

Creative Greenius

Alison Diaz (with scissors) along with ECHS staff and supporters about to cut the ribbon in front of Environmental Charter High School's new solar-powered greenhouse. and “How am I Powerful?”. Plants in black tubes behind the ECHS Science teacher are being fed by aquaponic system in the new solar-powered greenhouse.

Solar 150
article thumbnail

10-Year FTA Low-Speed Urban Maglev Research Program Shows Technology is Feasible, But Infrastructure Costs and Availability of Technologies Are Intimidating

Green Car Congress

EMS is made especially practical by continuing advances in electronic control systems that precisely maintain the air gap between vehicle and guideway, preventing contact and optimizing power usage. installed along the rail surface. ferromagnetic aluminum, copper, etc.) FTA Low-Speed Urban Maglev Research Program Lessons Learned.

Available 170