Remove Charging Remove Installation Remove Maryland Remove Solar
article thumbnail

EGEB: Maryland will spend $3.7M on electric car chargers

Electrek

In today’s Electrek Green Energy Brief (EGEB): Maryland is funding 36 public fast chargers and 145 workplace charging ports. 5000 2021 list is out, and solar has a solid foothold in the Top 20. UnderstandSolar is a free service that links you to top-rated solar installers in your region for personalized solar estimates.

article thumbnail

Blink Charging will more than triple EV charger production with a new factory

Baua Electric

Photo: Blink Charging EV charger maker Blink Charging (Nasdaq: BLNK) is turbocharging its manufacturing capacity with a new 30,000-square-foot factory in Maryland. Maryland Governor Wes Moore (D-MD) said, “We are thrilled to welcome Blink’s headquarters to the Great State of Maryland. It’s added one in 2.5

article thumbnail

Audi of America and Arcadia offer renewable energy subscription with e-tron or e-tron Sportback lease or purchase

Green Car Congress

Audi of America is offering qualified customers who purchase or lease a 2021 Audi e-tron or e-tron Sportback a subscription to Arcadia at no additional charge for up to five years. Arcadia connects renters and homeowners across the US to wind and solar energy through utility data and billing technology. 2021 Audi e-tron.

Audi 397
article thumbnail

GM adds 3 acres of solar arrays in Michigan

Green Car Congress

General Motors is increasing its renewable energy use with 3 acres of new solar arrays at two Michigan facilities. The company’s processing center in Swartz Creek and engine plant in Flint will feature 150 kW ground-mount solar arrays expected to generate a combined 400,000 kWh of renewable energy per year to the facilities’ grids.

Michigan 265
article thumbnail

Baltimore just deployed a big electric school bus fleet

Baua Electric

Highland Fleets announced in April that it would install 25 chargers and deploy 20 Type C electric school buses from IC Bus and 5 Type As from Collins Bus. Baltimore City students have higher rates of asthma than anywhere else in Maryland, with around 1 in 3 students being diagnosed.

article thumbnail

This anodeless, compressionless solid-state battery could be the next big thing 

Baua Electric

Maryland-based ION Storage Systems has just hit a significant milestone with its unique solid-state batteries (SSBs). To make sure you find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage , a free service that makes it easy for you to go solar.

article thumbnail

Spark EV newly LEED-certified motor plant 6% powered by renewables

Green Car Congress

The electric motor and drive unit for the Chevrolet Spark EV are being manufactured in Maryland under a rooftop solar array in a newly LEED-certified building. The greening of the General Motors Baltimore Operations complex included the addition of 580 kilowatts of solar to the roof of its e-Motor building. Together with a 1.23-megawatt

Baltimore 150