PNNL study finds 2028 grid resource adequacy likely sufficient for high EV penetration; managed charging strategies can double adequacy
Green Car Congress
JULY 30, 2020
The corresponding electric fleet sizes for the WECC footprint are 9 million LDVs, 70,000 MDVs and 94 HDV charging stations. although there are some available power plants in the WECC the electric power could not be delivered to the load centers because of transmission limitations.