article thumbnail

First EV charging station from Biden’s infrastructure plan opens in Ohio

Teslarati

President Joe Biden’s infrastructure plan has officially opened in Ohio, with several other sites reportedly having broken ground. In addition to the charging station in Ohio, the White House says that Vermont, Pennsylvania and Maine have also broken ground on their first NEVI-funded charging station. by 2030, with a total of $7.5

Ohio 108
article thumbnail

Proposed Changes to the Federal EV Tax Credit Passed by the House of Representatives

EV Adoption

For electric vehicles, the BBBA includes multiple proposed changes to IRC 30D, more commonly knows as the federal EV tax credit. Perhaps the mostly likely is the requirement for EVs to be assembled in the US in a union factory to qualify for an additional $4,500 tax credit. Tax Credit Becomes Refundable.

article thumbnail

Ohio supercharges its EV network with second round of NEVI charging stations

Baua Electric

Photo: DriveOhio Ohio, the first state to install a federally funded DC fast charger, leads again with NEVI rollouts, but its EV incentives are still nonexistent. Ohio announced the first round of EV charger locations in July 2023, which was followed by a first-in-the-US groundbreaking in October 2023.

Ohio 52
article thumbnail

Honda joins EV race with historic $11B investment to build 240K EVs a year

Baua Electric

Honda also invested $700 million to retool three Ohio plants to serve as its hub for future EV and EV battery production. Starting at $47,400 (excluding destination), the Prologue offers up to 296 miles range. Starting at $47,400 (excluding destination), the Prologue offers up to 296 miles range.

Honda 52
article thumbnail

2024 Honda Prologue boasts 300-mile dimension, sub-$50,000 worth

Baua Electric

Honda on Thursday equipped the primary main points on its 2024 Prologue, an electrical mid-size crossover the automaker guarantees with an EPA dimension estimate of as much as 300 miles. GM may also assemble the Prologue for Honda at a plant in North The usa, a progress that can allow the automobile to be eligible for EV tax credit.

Honda 52
article thumbnail

Jeep adds new Willys 4xe to PHEV lineup

Green Car Congress

The 2023 Jeep Wrangler Willys 4xe features 375 horsepower, 470 lb-ft (637 N·m) of torque, a 17 kWh battery that delivers 21 miles of all-electric range, a 2.72:1 Jeep Wrangler Willys 4xe is assembled at Stellantis’ Toledo Assembly Complex in Toledo, Ohio. Willys 4xe factory suspension lift delivers 10.1

Jeep 369
article thumbnail

Fisker releases details on $29,900 Pear production in the US

Teslarati

It plans to build a factory in Ohio for Fisker Pear production. One battery has an estimated range of 180 miles, while the other is made for longer trips with an estimated range of 320 miles per charge, based on Europe’s WLTP standard. Fisker is collaborating with Foxconn to produce the Pear.

Fisker 103