Remove Gas Remove Plug Remove Portland Remove Recharge
article thumbnail

New Flyer unveils Xcelsior CHARGE H2 bus; first to offer two fuel-cell-electric models eligible for federal funding

Green Car Congress

With a range of up to 300 miles (483 km), the bus can be refueled in 6-20 minutes depending on the model and operating conditions, and requires no overnight plug-in electrical re-charging. New Flyer currently has significant ZEB orders from major cities including Toronto, Boston, Minneapolis, New York, Portland, and Vancouver.

San Diego 276
article thumbnail

Ford begins production of 2012 Focus Electric at Michigan Assembly, C-MAX models on deck

Green Car Congress

Portland, Ore.; Ford will also be introducing the C-MAX Hybrid and the C-MAX Energi plug-in hybrid—also to be built at Michigan Assembly— for sale in the second half of next year. Phoenix and Tucson, Ariz.; Raleigh-Durham, N.C.; Richmond, Va.; Seattle; and Washington, D.C. Earlier post.).

Michigan 363
article thumbnail

Car Companies Standardize Plug for Electric Vehicles : Gas 2.0

Tony Karrer Delicious EVdriven

Write For GO About Advertise Contact Login Explore GO Media: News & Opinion Family & Lifestyle Business & Technology Gas 2.0 Caroline Reichert, a spokeswoman for the Germany energy company RWE , said leading automotive and energy companies have reached an agreement for a standardized plug for electric cars. as stated.

article thumbnail

Electric Car Buyer’s Guide: 7 Steps to Find The Best EV for Your Life

EV Life

Electric vehicles (EVs) are safer, greener, and cheaper to drive than gas vehicles. According to a recent study , the average American driver saves $1,117 per year on fuel and maintenance costs when they switch from a gas car to an electric one. For the Hyundai Kona below, EV Life estimates it will take one hour to recharge 5 miles.).

article thumbnail

MIT Battery Breakthrough Could Revolutionize Electric Cars : Gas 2.0

Tony Karrer Delicious EVdriven

Write For GO About Advertise Contact Login Explore GO Media: News & Opinion Family & Lifestyle Business & Technology Gas 2.0 3 David Herron said on March 16th, 2009 at 12:31 am Fast recharge will require huge power levels. To recharge 20 kilowatt-hours of capacity in 5 minutes requires 240 kilowatts of electricity.

MIT 45
article thumbnail

Clearing the roadblocks to electrification of heavy-duty trucks

Charged EVs

He later served as Transportation Electrification Manager at Portland General Electric, so he’s worked both sides of the electric fence. I was a big part of building the first-of-its-kind—at least in the Western world that we knew of—heavy-duty charging site in Portland, Oregon. What happens when we plug in 1.2-megawatt

Fleet 52
article thumbnail

Coming Soon – The Electric City

Revenge of the Electric Car

Across the street from City Hall, some drivers are already plugging converted hybrids into a row of charging stations. And at the headquarters of Pacific Gas and Electric, utility executives are preparing “heat maps” of neighborhoods that they fear may overload the power grid in their exuberance for electric cars.&#.