Remove Battery Remove Belgium Remove Grid Remove Renewable
article thumbnail

Volkswagen’s Elli and Elia Group partner to integrate EVs into the grid

Green Car Congress

Through its subsidiaries in Belgium (Elia) and the north and east of Germany (50Hertz), the company operates 19,192 km of high-voltage connections. The signatories Elli, Elia and re.alto say that the batteries of electric vehicles can help stabilize grids as the share of volatile, renewable energies increases.

Grid 247
article thumbnail

40 Tesla Megapacks replace WW2 turbojet generator in Belgium

Teslarati

A total of 40 Tesla Megapack battery storage systems replaced a World War II turbojet generator in Lessines, Belgium, Tesla announced. The system now has 50 MW of power and 100 MWh of capacity and supports the local grid. The system now has 50 MW of power and 100 MWh of capacity and supports the local grid.

Belgium 120
article thumbnail

Audi of America and Arcadia offer renewable energy subscription with e-tron or e-tron Sportback lease or purchase

Green Car Congress

Arcadia’s technology matches home energy consumption with renewable energy sources from a variety of US wind and solar projects using renewable energy certificates, all without any installation or disruptions to their utility service. seconds and a top track speed of 124 mph.

Audi 397
article thumbnail

Tesla powers Eneco’s largest battery project

Teslarati

Eneco, an energy producer in the Netherlands, is relying on Tesla to power its biggest battery project to date, which will be used to “more efficiently balance Belgium’s electricity grid” and is expected to be operational in 2024. Eneco is jointly owned by Mitsubishi Corp.

Power 129
article thumbnail

ENGIE New Ventures increases investment in 2nd-life battery company Connected Energy

Green Car Congress

Based in the United Kingdom, Connected Energy uses end-of-life EV batteries to create energy storage systems. These combine as many batteries as are needed for tailor-made solutions with capacity ranging from less than 100 kilowatt hours up to 15 megawatt hours or more. —Matthew Lumsden, CEO of Connected Energy.

Connect 186
article thumbnail

This Dutch City Is Road-Testing Vehicle-to-Grid Tech

Cars That Think

Unlike those you may have grown accustomed to seeing, many of these stations don’t just charge electric cars—they can also send power from vehicle batteries to the local utility grid for use by homes and businesses. Debates over the feasibility and value of such vehicle-to-grid technology go back decades. Kempton and Letendre’s.

Grid 90
article thumbnail

EC awards Better Place and partners €4.95M for EV infrastructure project, including battery switch stations

Green Car Congress

The project envisions the analysis, testing and deployment of a multi-transport mode network using the current road infrastructure and railways coupled with an electric car charging network of battery switch stations and charge spots powered by renewable energy along with intelligent transport systems.

Denmark 230