article thumbnail

The EV Transition Explained: Can the Grid Cope?

Cars That Think

There have been vigorous debates pro and con in the United States and elsewhere over whether electric grids can support EVs at scale. trillion in capital, operations, and maintenance costs by 2035. As energy expert Chris Nelder noted at a National Academy EV workshop , “vehicle-to-grid is not really a thing, at least not yet.

Grid 117
article thumbnail

Skanska is about to transform a Brooklyn marine terminal into a major offshore wind hub

Baua Electric

Skanska will build a new 85,000-square-foot operations and maintenance building with warehouse, office, and parking to support the construction and ongoing operations and maintenance of Empire Wind 1. There will also be significant waterfront and marine upgrades. Construction activities covered by this award will run into 2026.

Mariner 52
article thumbnail

SoCal Edison white paper shares data about PEV usage and charging

Green Car Congress

The paper, “Charged Up: Southern California Edison’s Key Learnings about Electric Vehicles, Our Customers and Grid Reliability,” shares information based on customer data and utility operations gathered since SCE began to prepare the distribution system and its customers for widespread electric vehicle (EV) adoption in its service territory.

Charging 246
article thumbnail

California Energy Commission awards $750K to Electricore to study standardization of plug-in vehicle batteries

Green Car Congress

Standardizing PEV batteries could reduce the purchase and ownership costs of PEVS, as well as addressing additional consumer issues such as maintenance and safety. The stored, compressed air will be used to generate electricity on an “on demand” basis to meet the facility’s needs, including periods of high demand or grid outages.

Standards 244
article thumbnail

Is Exponential EV Adoption in the U.S. an Expensive Headache for Utilities or an Opportunity for New Revenue?

Driivz

Grid congestion is imminent If we look at the big picture, EV charging only accounts for about 4% of total demand for electricity; not something for utilities to be alarmed about. With over 123,000 public and semi-public charging stations in the Netherlands, the grid is already experiencing severe congestion.

Grid 52
article thumbnail

What Is a Charge Point Operator (CPO)?

Driivz

A CPO may start with a smaller-scope network but quickly install new charge points in an expanding geographical footprint, which can cause performance issues and high maintenance costs — particularly if hampered by aging chargers. Scalability Scalability is critical to keep up with the rapidly expanding growth of the EV market.

article thumbnail

How to Prevent a Power Outage From Becoming a Crisis

Cars That Think

There are technical reasons that contributed to faster repairs in Manhattan, but in general the neighborhoods that waited the longest to have their power restored tended to be poorer and less white. And it slowed urgent repair and maintenance of the power grid, with work crews having to practice social distancing due to the pandemic.