Remove Corporation Remove Forecast Remove Grant Remove Grid
article thumbnail

A123 Systems 8K filing says substantial doubt about its ability to continue as a going concern; status of grants and incentives

Green Car Congress

The above circumstances, along with the Company’s history and near term forecast of incurring significant net losses and negative operating cash flows, raise substantial doubt on the Company’s ability to continue as a going concern. A123 Systems has been the recipient of a number of state and federal grants and tax incentives.

Grant 299
article thumbnail

DOE awarding $1.6B to 11 battery materials separation and processing projects as part of $2.8B funding

Green Car Congress

billion to 21 projects to expand domestic manufacturing of batteries for electric vehicles (EVs) and the electrical grid and for materials and components currently imported from other countries. As part of the fluorinated solutions business group of Orbia, a publicly traded global corporation with total revenues of $8.7 Earlier post.)

Parts 459
article thumbnail

Opinion: Why Lithium Will See Another Price Spike This Fall

Green Car Congress

Electrical Grid Connections. While future demand from the automotive industry is significant, the real game changer for the lithium industry may be electrical grid storage. Grid storage is designed on a variety of scales, each with a different price point. New Entrants: Where It Gets Really Interesting.

Price 150
article thumbnail

An inside look at how utilities view EVs: expanding electricity sales without adding new customers

Charged EVs

Once you remove that concern, we forecast seeing an influx in vehicles. And I’m happy to share that that forecast has held true. The anti-EV crowd is fond of saying that EVs are going to “crash the grid.” So it becomes a long time before it starts to tax the grid. Is that a problem? They charge at night.

Sale 81
article thumbnail

Building a Zero Trust Security Model for Autonomous Systems

Cars That Think

Similar tactics that leveraged physical and mobile autonomous things could extend the blast radius beyond IT infrastructure to destroy physical infrastructure like factories, pipelines, electric grids, or worse. In early 2021, the FAA granted American Robotics the first license to fly drones beyond the visual line of sight (BVLOS).

Building 119
article thumbnail

Solar Smackdown in Torrance – Installer Sues City on Behalf of the Sun

Creative Greenius

I went and spoke to their City Council and said “For $50,000 a house I’ll put in solar AND battery systems and take you off the grid. If you’re going to do it, take the homes off the grid. That’s pretty mean to the rest of the grid. You pay your corporate taxes on-line. Everything else is wireless.”. Isn’t it beautiful?

Solar 210
article thumbnail

Gas War: U.S. House Suggests Ending California Emissions Authority, White House Says Nope

The Truth About Cars

Just a few days after the California Air Resource Board's mandate came out, Governor Newsom had to publicly beg electric vehicle owners not to charge their cars due to concerns of the power grid and blackouts. This winter, residents in the Sierra Nevada mountains lost power for days due to heavy snow storms. percent of U.S.