Remove Connected Remove DC Remove Installation Remove Tennessee
article thumbnail

ECOtality installs first DC fast charger in Tennessee

Green Car Congress

ECOtality and Cracker Barrel Old Country Store unveiled the first Blink Direct Current (DC) Fast Charger in Tennessee at the Lebanon Cracker Barrel location. This is the first of 12 Cracker Barrel locations statewide that will install DC Fast Chargers as a part of The EV Project.

Tennessee 170
article thumbnail

Tritium opens its first US-based EV fast charger manufacturing plant

Green Car Congress

Tritium DCFC Limited opened its first US-based EV fast charger manufacturing facility, located in Lebanon, Tennessee. Tritium’s Tennessee facility will initially produce the company’s award-winning RTM fast charger, and is expected to start production on the PKM150 early next year.

article thumbnail

Cracker Barrel to install 24 Ecotality EV charging systems in select Tennessee locations; Level 2 and Fast Charge

Green Car Congress

Cracker Barrel Old Country Store is becoming a major participant in The EV Project and will install 24 Blink electric vehicle (EV) chargers, provided by ECOtality, Inc., at select locations in “The Tennessee Triangle,” the 425-mile stretch of interstate highway that connects Nashville, Knoxville, and Chattanooga.

Tennessee 247
article thumbnail

DOE awarding $71M to 20 RD&D projects to cut GHG emissions, expand EV infrastructure; $5M to Achates for opposed-piston 2-stroke hybrid

Green Car Congress

This includes EV charging community projects, such as installing charge stations within multi-unit housing, hosting community-led demonstrations that address barriers to EV adoption and lowering costs for direct current (DC) fast charging equipment. Tennessee Technological University. Metropolitan Energy Center. BorgWarner Inc.

Emissions 304
article thumbnail

Maxwell supplying ultracaps to ABB for hybrid version of Philadelphia rail energy recuperation system

Green Car Congress

ABB will install a hybrid version of its high-efficiency ENVILINE wayside energy recovery and storage system for the Southeast Pennsylvania Transit Authority’s (SEPTA) light rail system serving the greater Philadelphia area. Maxwell Technologies, Inc.

article thumbnail

Improve EV charging ROI and customer experience by choosing the right fast chargers

Charged EVs

Some charging operators assume they need the highest-power DC chargers available, but it makes more sense to choose the right power levels for the use case of each specific charging site. Shortly after that, your focus seemed to shift to DC fast chargers. Then they got involved in developing the first DC fast charger.

Charging 116
article thumbnail

New seamless charging network across18 states

Electric Auto Association

Six major utility companies join together to add EV Fast Chargers to connect Gulf Coast, Midwest and Atlantic state destinations. =. Charging stations will provide DC fast chargers that are capable of getting drivers back on the road in approximately 20-30 minutes. Blue, President and Chief Executive Officer at Dominion Energy.