Remove Companies Remove Fresno Remove Gas-Electric Remove Installation
article thumbnail

Tesla Semi Pepsico fleet ready to take on the road

Teslarati

Public documents showed that the global beverage company submitted to install 8 Megacharger stalls at its facility in Fresno, California. The beverage company has a total of 18 Tesla Semis supporting Sacramento, making it the first metropolitan area to integrate sustainable class-8 trucks into operations.

Fleet 120
article thumbnail

More Tesla stationary ESS partnerships: Cargill and PG&E, LichtBlick

Green Car Congress

Cargill is collaborating with Tesla and Pacific Gas & Electric (PG&E) to install a 1 MWh Tesla energy storage product at the company’s Fresno, California beef processing facility. The electricity stored in the batteries will then be used when rates are the highest each day during peak use times (peak trimming).

Fresno 150
article thumbnail

Cal Energy Commission approves ~$9M for DC fast chargers; $12.6M for NGV incentives

Green Car Congress

The California Energy Commission approved nearly $9 million in grants for the installation of DC fast chargers along major state freeways and highways to allow electric vehicle drivers to travel from San Diego to the Oregon border without worrying about running out of energy. The grants went to four companies—Chargepoint Inc.;

DC 150
article thumbnail

The City of Porterville Partners with EV Connect to Deploy EV Charging

EV Connect

Located in the San Joaquin Valley, with Fresno to the north and Bakersfield to the south, the City of Porterville, California, serves as a gateway to Sequoia National Forest, Giant Sequoia National Monument, Kings Canyon National Park, and as a vital pit stop for travelers along the Great Western Divide Highway.

Connect 52
article thumbnail

The Business of Plugging In: Building the Full Ecosystem for a Successful Plug-in Vehicle Industry in the US

Green Car Congress

As one example in the opening plenary panel session, Peter Darbee, Chairman and CEO of Pacific Gas & Electric Corporation described the opportunity and challenges from his utility’s point of view. The impact from plug-in electric vehicles on the grid could be very substantial. kW—about three times the load.

Plug-in 210
article thumbnail

California Energy Commission awards more than $17M to support alternative fuel and infrastructure projects

Green Car Congress

The order also requires the installation of sufficient infrastructure to support 1 million ZEVs in California by 2020. will receive $6 million to build a commercial biodiesel production facility in Fresno. will receive $2,150,000 for the purchase and installation of electric vehicle charging equipment. Earlier post.).

article thumbnail

Tesla Semi ‘breakdown’ caused by software switch glitch

Teslarati

Since Tesla delivered the first units of its all-electric Semi to Frito-Lay facilities in Modesto, California, in December 2022, any instance of one breaking down on the side of the road has been photographed and highly publicized. In fact, the facility is set to have Megachargers installed at its plant in Fresno, California.

Tesla 100