Remove Austria Remove Charging Remove Commercial Remove Installation
article thumbnail

Electric Vehicle Arteries (EVA+) fast charging: Enel, Verbund, Renault, Nissan, BMW & Volkswagen partner in Italy & Austria

Green Car Congress

Enel, as coordinator, and Austria’s main utility Verbund are collaborating on a fast-recharging network project in Italy and Austria, alongside some of the world’s largest EV carmakers including Renault, Nissan, BMW and Volkswagen Group Italia (represented by Volkswagen and Audi). A grant agreement worth a maximum of €4.2

Austria 150
article thumbnail

bp invests €7.5M in EV charging service provider Service4Charger as part of a €10M Series A

Green Car Congress

million in the Service4Charger GmbH, a Berlin-based provider for the planning, installation, operation and maintenance of EV charging infrastructure. million in the Service4Charger GmbH, a Berlin-based provider for the planning, installation, operation and maintenance of EV charging infrastructure.

Charging 150
article thumbnail

QUANTRON introduces new CIZARIS 12m electric bus; BEV first, fuel cell model next year

Green Car Congress

With between 242 and 424 kWh of selectable battery capacity, the roof-mounted battery packs only (a maximum of six in the front and six in the rear depending on customer preference) are fast-charged with 65 to 150 kW direct current (DC) in two to five hours.

Fuel 448
article thumbnail

MAN Truck & Bus exploring 2nd life, recycling strategies for traction batteries

Green Car Congress

These forecasts show that the commercial vehicle industry is only at the beginning of electrification. The analysis starts with the first life of the battery in the vehicle: The focus here is on training customers to drive, charge and use the vehicles so that the load on the battery is minimized.

Batteries 199
article thumbnail

MAN eTGE battery-electric van to be mass-produced from July onwards

Green Car Congress

Around 70% of light commercial vehicles used in urban areas travel fewer than 100 kilometers per day on average. A 40 kW charging station fills a battery up to 80% in 45 minutes. Approximately nine hours are needed for a full charge with 220V AC. The average speed reached during this is low.

Batteries 218
article thumbnail

Three fire trucks with Volvo Penta electric drivelines heading to Berlin, Amsterdam and Dubai to begin customer testing

Green Car Congress

The truck was officially launched at an event in Austria. By walking away from conventional commercial vehicle concepts and developing an electric solution for the truck’s driveline, Volvo Penta and its customer Rosenbauer have introduced a completely new vehicle architecture for the fire service industry.

Volvo 207
article thumbnail

Mercedes-Benz Introducing More BlueTec EEV trucks

Green Car Congress

Mercedes-Benz commercial vehicles equipped with this feature can be recognized by the additional “BlueTec EEV” model plate. In terms of maintenance, operating life, fuel consumption, weight and installation space, the EEV solution adopted for Mercedes-Benz trucks is at the same level as with the well-proven BlueTec 5 technology.

Mercedes 225