Remove Connected Remove DC Remove San Diego Remove Store
article thumbnail

Cal Energy Commission approves ~$9M for DC fast chargers; $12.6M for NGV incentives

Green Car Congress

The California Energy Commission approved nearly $9 million in grants for the installation of DC fast chargers along major state freeways and highways to allow electric vehicle drivers to travel from San Diego to the Oregon border without worrying about running out of energy. EV Connect Inc.; Zero net energy.

DC 150
article thumbnail

ECOtality to Provide Blink EV Charging Stations at Select US Best Buy Stores

Green Car Congress

will provide electric vehicle (EV) charging stations ( earlier post ) at select US stores of electronics retailer Best Buy Co., Under the terms of the agreement, the Level 2, J1772-compliant charging stations will be installed at 12 Best Buy stores in Tucson, Ariz.; San Diego, Calif. ECOtality, Inc. Phoenix, Ariz.;

Store 218
article thumbnail

ARPA-E announces $98M in funding for 40 OPEN projects; two opposed-piston engines projects receive $10M total

Green Car Congress

A motor-generator integrated on each engine crankshaft will provide independent control to each piston and eliminate all torque transmitted across the mechanical crankshaft connection, thus reducing engine size, mass, cost, friction, and noise. University of California, San Diego. Georgia Tech Research Corporation.

Engine 247
article thumbnail

California Energy Commission awards more than $1.8M additional funding to further UCSD microgrid project; energy storage, EV charging and V2G services are components

Green Car Congress

The California Energy Commission (CEC) approved funding to advance further the development of its pioneering 42 MW peak microgrid and expand electric vehicle charging at the University of California, San Diego (UCSD). The return on this investment extends far beyond the San Diego campus. The Commission approved a $1.6-million

article thumbnail

More details about California’s proposal requiring bidirectional charging capabilities for all EVs

Charged EVs

You could do V2G through the DC port of the vehicle—this is what we are doing with school buses here in California, where our charging station converts AC to DC and then connects to the DC port of the vehicle to provide power. The bill doesn’t say how the bidirectional capability needs to be integrated.

Charging 133
article thumbnail

V2G company Nuvve participating in California’s wholesale energy markets to help balance the grid

Green Car Congress

Nuvve Corporation, a San Diego-based vehicle-to-grid (V2G) technology company, is participating in a program to deliver resource adequacy to local utility San Diego Gas & Electric (SDG&E) and California’s electrical grid using a large stationary battery located on the University of California San Diego’s (UC San Diego’s) campus microgrid.

Grid 334
article thumbnail

Road Test: 2021 Chrysler Pacifica Plug-in Hybrid

Clean Fleet Report

The Pacifica Hybrid does not have a Level 3/DC fast charger capability. San Diego to San Francisco? The horizontal LED tail lights, are connected by a light strip that runs the full width of the rear. Expect about 14 hours with a regular, 110-volt household outlet. Charlotte to Orlando? New York City to Toledo?