Remove Commercial Remove Cost Remove Cost Of Remove Puerto Rico
article thumbnail

Why the Next Microgrids Will Be Well Connected

Cars That Think

In September 2017 , Hurricane Maria devastated Puerto Rico. Several factors combine to make Puerto Rico an ideal place for solar power and microgrids. The group is a pioneer in bringing solar energy to Puerto Rico, having installed the first photovoltaic (PV) panels in Adjuntas in 1999. megawatts to 224.6

article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

National Electric Vehicle Infrastructure (NEVI) Program The NEVI program makes funding available to all 50 states, Washington DC, and Puerto Rico for EV charging projects along AFCs. Let’s look at some of the available funding for businesses. Any projects funded via CFI must meet the EV Charging Minimum Standards Rule.

Store 95
article thumbnail

DOE reports show major potential for wave and tidal energy production near US coasts

Green Car Congress

To support the development of technologies that can tap into these water power resources, DOE’s Water Power Program is undertaking a detailed technical and economic assessment of a wide range of water power technologies in order to more accurately predict the opportunities and costs of developing and deploying these innovative technologies.

article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

National Electric Vehicle Infrastructure (NEVI) Program Each of the 50 states, Washington, DC, and Puerto Rico was allocated funds to distribute to eligible businesses. Please see Blink’s Commercial Incentives tool to search for state and local government funding and rebate programs by entering your zip code.

Store 52
article thumbnail

Blink’s 2023 Year in Review

Blink Charging

We signed agreements to bring Level 2 charging to Arcos Dorados’s McDonalds franchises in Puerto Rico and to bring DC fast charging to Royal Farms convenience stores in the Mid-Atlantic. Businesses now need to be situated in eligible census tracts to claim a base credit of 6% of total project cost, per station, up up to $100,000.

article thumbnail

ARPA-E to award $22M to 18 projects to accelerate production of macroalgae for energy and other uses; MARINER

Green Car Congress

Macroalgae can be utilized as a feedstock for domestic transportation fuels, chemicals and other commercial products without competing with food crops for land and water. Today, nearly all domestic biomass produced for electricity generation and liquid fuels occurs on land. —ARPA-E Acting Director Eric Rohlfing.

Mariner 150
article thumbnail

Everything You Should Know About the National Electric Vehicle Infrastructure Formula Program

EV Connect

On September 27, the Biden-Harris Administration announced it has approved Electric Vehicle Infrastructure Deployment Plans for all 50 States, the District of Columbia, and Puerto Rico ahead of schedule under the National Electric Vehicle Infrastructure Formula Program (NEVI for short). and Puerto Rico, had submitted their plans.