Remove Available Remove Fresno Remove Installation Remove Miles
article thumbnail

Up to $29M available for public EV chargers in SoCal; SCIP accepting applications

Green Car Congress

Up to $29 million is now available through the Southern California Incentive Project ( SCIP ) to install charging stations in the four-county area. California aims to get 5 million EVs on its roads by 2030 and to install 250,000 vehicle charging stations to support those vehicles.

Available 210
article thumbnail

Project to award up to $15.5M in rebates for EV chargers in Sacramento County

Green Car Congress

million in funds available for qualifying local businesses and nonprofit organizations. The rebates will be available through the Sacramento County Incentive Project to install both commercial-grade Level 2 chargers and high-powered DC fast chargers. Rebates for Level 2 chargers are up to $6,000 per connector.

article thumbnail

Electrify America opening first California EV fast charging station in Torrance; targeting 9 in California by year-end

Green Car Congress

The Country Hills Shopping Plaza in Torrance, California will be the site of the first DC fast charging station to open in the state as part of Electrify America’s plan to install approximately 160 charging stations in California by June 2019. Within California, average distance between stations is projected to be 48 miles.

article thumbnail

Lightning Systems battery-electric heavy-duty Ford Transit showing 61 MPGe city, 66 MPGe highway

Green Car Congress

Last month, Lightning Systems announced that it has developed a hydrogen fuel cell version of the LightningElectric developed in partnership with several industry partners that will extend the range of the vehicle to more than 200 miles. LightningElectric is available for the Ford Transit as part of Ford’s eQVM program.

Ford 257
article thumbnail

CARB approves Electrify America’s second $200M investment in California

Green Car Congress

In Cycle 2, Electrify America also will continue to invest in the six Cycle 1 metros: Fresno. Highways & Regional Routes: The new Cycle 2 investments will continue to build out a highway network of DCFC stations featuring charging power up to 350 kilowatts which can recharge a vehicle at up to 20 miles of range per minute. Santa Rosa.

article thumbnail

Electrify America announces $200M Cycle 2 zero emission vehicle investment plan for California

Green Car Congress

Electrify America also will continue to invest in the six Cycle 1 metros: Fresno. Highways & Regional Routes: The new Cycle 2 investments announced today will continue to build out a highway network of DCFC stations featuring charging power up to 350 kilowatts which can refuel a vehicle at up to 20 miles of range per minute.

America 239
article thumbnail

Fresno County unveils countywide solar-powered EV charging program using Envision Solar’s EV ARC

Green Car Congress

FCRTA selected Envision Solar’s EV ARC product, which is the only rapidly deployable, transportable solar powered EV charger available while simultaneously being the only renewably energized EV charging solution which provides both EV charging and emergency power during a grid failure.

Fresno 170