Remove Installation Remove New Jersey Remove Sale Remove Wind
article thumbnail

New Jersey resuscitates offshore wind with two new projects

Baua Electric

Photo: Ocean Wind 1 Ørsted dealt New Jersey a massive blow by canceling 2.2 gigawatts (GW) of offshore wind last year, but the state just added 3.7 GW of new projects to its pipeline. New Jersey was expected to announce another offshore wind solicitation at the beginning of 2024, and it’s delivered.

article thumbnail

The US just proposed 18 GW of new offshore wind sales

Baua Electric

Hywind floating offshore wind turbine by U.S. The US announced two proposals for offshore wind sales that could generate more than 18 gigawatts (GW) of clean energy – enough to power more than 6 million homes. It’s the first in a five-year lease schedule that could see up to 12 separate offshore wind auctions.

Wind 52
article thumbnail

Biden Administration launching offshore wind offensive

Green Car Congress

The Biden Administration announced a series of measures to support rapid offshore wind deployment, including designation of a new wind energy area and targeting the deployment of 30 GW of offshore wind by 2030. New Wind Energy Area. Deploying 30 GW of Offshore Wind by 2030.

Wind 199
article thumbnail

SunPower ceases residential installations, lays off 1,000

Baua Electric

SunPower (Nasdaq: SPWR) just sent an email to its employees saying that it will “wind down” residential solar installations and lay off 1,000 employees. SunPower is one of the largest residential solar installers in the US. We are also reducing our workforce to better align our business with our new focus.

article thumbnail

Hitachi and Demansys to demo CrystEna Energy Storage System for grid frequency regulation and capacity services

Green Car Congress

and Demansys Energy LLC reached an agreement to perform a demonstration project utilizing Hitachi’s “CrystEna” (Crystal+Energy) compact 1 MW container-type energy storage system in the market for frequency regulation and capacity services, and that site installation work will soon commence. Hitachi America, Ltd.,

article thumbnail

Flash Drive: 2023 Genesis GV70 EV AWD

Clean Fleet Report

Wind and road noise were reduced partly due to acoustic laminated glass and sound-deadening insulation. Most owners will opt to install a 240V Level 2 charger at their home that will replenish 10% to 100% in about seven hours. There was limited body roll and the ride was comfortable and confident.

article thumbnail

Honda launches new “Green Path” initiatives for manufacturing and operations; new $210M paint line at Marysville with new 4C2B process

Green Car Congress

Honda has installed a 1-megawatt rooftop solar array at its 400,000 square foot parts distribution center in Windsor Locks, Connecticut. Another example of this effort is Honda’s Russells Point, Ohio, transmission plant, which is the first auto plant in America to utilize on-site wind power for a substantial portion of its energy use.

Honda 150