Remove Connect Remove DC Remove Oakland Remove Plug-in
article thumbnail

Rocsys to supply autonomous CCS charging solutions to SSA Marine for electric yard tractors at Port of Oakland

Green Car Congress

The systems will autonomously charge part of the electric yard tractor fleet of SSA Marine at the International Container Terminal at the Port of Oakland. ROC-1 will work with high power DC charging stations that use a CCS-1 charging connector, offering capability to autonomously charge the vehicles from existing charging supply equipment.

Oakland 293
article thumbnail

California Energy Commission approves $46.6M for hydrogen refueling and $2.8M for EV charging projects

Green Car Congress

million hydrogen, battery electric, and plug-in electric vehicles on the roadway by 2025. Linde LLC was awarded $4,250,000 to install two hydrogen refueling stations located in San Ramon and Oakland. California’s zero-emission vehicle goal is to get 1.5 ITM Power Inc. Ontario CNG Station Inc.

Hydrogen 354
article thumbnail

CARB approves Electrify America’s second $200M investment in California

Green Car Congress

Partial Consent Decree, CARB moved forward the company’s plans for DC fast-charging in more metro areas, adding charging for regional routes, and strengthening highway networks. San Francisco-Oakland-Hayward. In finding that Electrify America’s Cycle 2 California ZEV Investment Plan meets or exceeds all requirements of the 2.0L

article thumbnail

Electrify America announces $200M Cycle 2 zero emission vehicle investment plan for California

Green Car Congress

Highlights of the California Cycle 2 ZEV Investment Plan include: Metropolitan Areas: The central focus of electric vehicle charging infrastructure investment in Cycle 2 will shift to more DC Fast Charging (DCFC) stations within metro areas, where electric vehicle (EV) drivers are expected to charge most often. San Francisco-Oakland-Hayward.

America 239
article thumbnail

Solar-powered off-grid EV charging stations offer surprisingly attractive cost advantages

Charged EVs

EV ARCs can be deployed with Level 1, Level 2 or (using 4 or more units connected together) DC fast charging. We make products that happen to use renewable sources of energy as opposed to connecting to the grid for the primary source of energy. Q&A with Beam Global CEO Desmond Wheatley. The EV ARC features a 4.3

Grid 143