Remove Battery Remove Charging Remove Installation Remove Puerto Rico
article thumbnail

First 35 State plans to build out EV charging infrastructure approved; more than $900M in FY22 and FY23 funding

Green Car Congress

The Department of Transportation’s Federal Highway Administration (FHWA) announced the approval—ahead of schedule under the National Electric Vehicle Infrastructure (NEVI) Formula Program ( earlier post )—of 35 Electric Vehicle (EV) Infrastructure Deployment Plans from States, the District of Columbia and Puerto Rico.

article thumbnail

Altairnano to provide 2MW Li-ion storage system for solar project in Puerto Rico

Green Car Congress

will provide a 2MW ALTI-ESS Advantage advanced energy storage system to provide ramp-rate control for smoothing the power fluctuations associated with photovoltaic applications in addition to frequency regulation for the San Fermin 26 MW photovoltaic solar farm in Loiza, Puerto Rico. Altair Nanotechnologies Inc.

article thumbnail

Biden Administration opens applications for $2.5B program funding the growth of EV charging infrastructure

Teslarati

billion program, funding the expansion of battery electric vehicle charging stations and alternative fuel infrastructure in the United States. Department of Transportation is the “Charging and Fueling Infrastructure (CFI) Discretionary Grant Program. The Biden-Harris Administration opened applications for its $2.5

article thumbnail

Walmart is rolling out its ‘coast-to-coast’ network of DC fast chargers

Baua Electric

Photo: Walmart Walmart is kicking off plans to build and remodel hundreds of stores in the US – and those plans include installing DC fast chargers. DC fast charger installation is included in that plan. It already has almost 1,300 DC fast-charging stations at more than 280 US stores. Let the mega rollout begin.

DC 52
article thumbnail

smart USA names Coulomb Technologies as Preferred Supplier of Charging Stations for EVs

Green Car Congress

smart USA has selected Coulomb Technologies as its preferred supplier of charging stations for the company’s smart fortwo electric drive vehicles. Coulomb’s ChargePoint Networked Charging Stations for plug-in electric vehicles will be sold through the smart USA dealer network for business, consumer and home charging.

USA 186
article thumbnail

What are the investment opportunities in the Alternative Fuel Corridor Program?

Setec Powerr

Charging facilities and electric vehicle development are positively correlated, and the only way to drive better growth of electric vehicles is to network and scale the construction of charging facilities. Ready means that the corridor has adequate charging and fueling capability. DC fast EV Charging Chargers.

article thumbnail

Why the Next Microgrids Will Be Well Connected

Cars That Think

In September 2017 , Hurricane Maria devastated Puerto Rico. Several factors combine to make Puerto Rico an ideal place for solar power and microgrids. Next year, we plan to install and further test our controller on-site in the central Puerto Rican community of Adjuntas.